A semi detached industrial unit, constructed around a steel portal frame with corrugated roof over. Two storey offices are positioned to the front of the site, which is secured with the adjacent property with palisade fencing.
The building is constructed to provide open industrial accommodation, to an internal clearance of 3 metres, with roller shutter access over a self contained loading forecourt. Suspended LED lights are installed throughout and gas blower heating.
The offices are proportionately set out to provide mostly open plan office accommodation over both floors with ground floor WCs.