Central Approach, Western Approach, J1 M49, Bristol, BS35 4GG
- SIZE AVAILABLE
113,573 sq ft
10,551 sq m
- SECTOR
Distribution warehouse to lease
- USE CLASSUse class orders: B1 Business, B2 General Industrial and B8 Storage and Distribution
B1, B2, B8
Lease details
- Lease available date:
- Ask agent
Key features
- 12m eaves height
- 50 KN/m2 floor loading
- 1 MVA Power Supply
- 10 dock level (inc 2 euro-docks) and 4 surface level loading doors
- Secure self-contained yard with 50-70mm depth
- 15 marked HGV parking spaces with potential to accommodate up to 41 trailer spaces
- Fitted first floor office accommodation
- Fibre connectivity
- 24 cycle spaces and shower facilities
- 89 car parking spaces inc 9 EV charging spaces with ducting for an additional 9
Description
Now Available for Immediate Occupation
Central Approach is situated in the South West's premier logistics location and it is host to several national and international occupiers. The site is located between Junction 1 of the M48 and Junction 18 of the M5. This well established distribution and manufacturing park benefits from fast and easy access to the M4 and M5 motorways.
When works to connect Junction 1 on the M49 are completed, this will deliver direct access into Central Park and Western Approach. This in turn will provide for a faster route onto the national motorway network. Central Approach is within 1 mile and a 3 minute drive of the new junction.
Specification:
* Rare freehold or leasehold opportunity
* Flexible B1(c)/E(g)(iii), B2 and B8 planning use.
* 12m eaves height
* 50 kn/m2 floor loading
* 1 MVA power supply
* 10 dock level (including 3 euro-docks) and 4 surface level loading doors
* Secure self-contained yard with 50-70m depth
* 15 marked HGV parking spaces with potential to accommodate up to 41 trailer spaces
* Fitted first floor office accommodation
* Fibre connectivity
* 24 cycle spaces and shower facilities
* 89 car parking spaces including 9 EV charging spaces with ducting for an additional
* High quality landscaped environment
* Energy Performance rating A-15
Accommodation:
Warehouse: 106,918 sq ft / 9,933 sq m
First Floor Offices: 6,655 sq ft / 618 sq m
Total GIA: 113,573 sq ft / 10,551 sq m
For Sale/For Rent:,/b>
Price on application
Connectivity:
- 1 mile from New M49 Junction
- 5 miles from M48 J1
- 6 miles from M5 J18/J18A
- 7 miles from Avonmouth Docks
- 9 miles from M4/M5 Interchange
- 10 miles from Royal Portbury Dock
- 17 miles from Bristol City Centre
- 18 miles from Bristol Airport
- 37 miles from Cardiff
- 82 miles from Exeter
- 98 miles from Birmingham
- 100 miles from Southampton
- 124 miles from London
Brochures
Central Approach, Western Approach, J1 M49, Bristol, BS35 4GG
NEAREST STATIONS
Distances are straight line measurements from the centre of the postcode- Severn Beach Station1.1 miles
- Pilning Station1.1 miles
- St. Andrews Road Station3.2 miles
About CBRE Limited (Bristol), CBRE Bristol - Industrial
Clifton Heights Triangle West, Clifton, Bristol, BS8 1EJ
Notes
Disclaimer - Property reference CentralApproachWesternApproachBristol. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by CBRE Limited (Bristol), CBRE Bristol - Industrial. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.
Map data ©OpenStreetMap contributors.