
Land for sale
Frampton Park, Dorchester, Dorset, DT2
- PROPERTY TYPE
Land
- SIZE
768,398 sq ft
71,387 sq m
Key features
- 17.64 acres (7.14 hectares) of Pasture and Woodland
- EPC Rating = C
Description
Description
5.17 acres (6.14 hectares) of pastureland and 2.47 acres (1.00 hectare) of attractive, shelterbelt woodland. Level to sloping with stream frontage to the north. Split into two parcels.
Acreage: 17.64 Acres
Additional Info
In the event that Lot 4 is sold to a purchaser other than the purchaser of Lot 1, a right of access over the southern edge of Lot 1 will be granted as shown hatched black on the sale plan.
Brochures
Web DetailsFrampton Park, Dorchester, Dorset, DT2
NEAREST STATIONS
Distances are straight line measurements from the centre of the postcode- Maiden Newton Station2.9 miles
- Dorchester West Station4.7 miles
- Dorchester South Station5.0 miles
Notes
Disclaimer - Property reference WBS250100. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Savills, Wimborne. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.
Map data ©OpenStreetMap contributors.





