Amplify Guildford, Midleton Industrial Estate Road, Guildford, GU2 8XW
- SIZE AVAILABLE
20,139-43,656 sq ft
1,871-4,056 sq m
- SECTOR
Warehouse to lease
- USE CLASSUse class orders: B2 General Industrial and B8 Storage and Distribution
B2, B8
Lease details
- Lease available date:
- 01/07/2026
- Lease type:
- Long term
Key features
- Clear Internal Height: Units 1 – 10.5m Unit 2 & 3 – 8.5m
- All units have a Floor Loading capacity of 50kN/m2
- Electric level access loading doors to all units
- Yard depths ranging from 21m-35m
- Fully secure yards
- Fully fitted first floor office space
- Allocated car parking spaces (69 spaces)
- Allocated cycle parking (24 spaces)
Description
Industrial & Warehouse Development Amplify Business Park, is an exciting and unique 3 unit speculative warehouse/industrial development with units ranging from 20,139 – 43,656sq.ft
The scheme will be developed to the highest specification and green credentials, including targeting BREEAM ‘Outstanding’ and EPC A+ , which indicate that the buildings will achieve net zero CO2 emissions for regulated energy uses.
• 3.3 acre site.
• Providing 3 new urban industrial units totalling 72,008 sq.ft.
• All units finished to the highest specification.
• Occupiers benefit directly from photovoltaic panels on all units.
• Full secure gated development, with a self-contained secure yard to Unit 1.
• Planning fully granted for use classes E(g)(iii), B2 and B8.
Location
The scheme is strategically located on the edge of Guildford town centre benefitting from unrivalled proximity to the A3 and providing direct access to central London and Junction 10 of the M25 Motorway. Located in a the heart of an establish industrial location, you will be in good company with well-known occupiers; Screwfix, Porsche, Halfords, Euro Car Parts, Topps Tiles & Wickes.
The property is located on Midleton Industrial Estate Road, advantageously located to Central Prime Railway Guildford Town Centre and local amenities. With unrivalled connectivity, the development is close to the junction with Ladymead (A25), which in turn provides excellent access to the A3 and onwards into central London. Junction 10 of the M25 is only a few minutes drive providing a strategic link to the wider motorway network.
The site further benefits from excellent local bus services with the nearest stops within easy walking distance to the development.
Specifications
The development will also have the Goya green credentials and superior specification, with the buildings designed to perform for all occupiers.
• Clear Internal Height:
Units 1 – 10.5m
Unit 2 & 3 – 8.5m
• Electric level access loading doors to all units.
• All units have a Floor Loading capacity of 50kN/m2
• Fully secure yards
• Yard depths ranging from 21m-35m
• Power allocation up to 1MVA across all Units
• 24Hr Operational Capabilities
• 15% roof lights to ensure natural light to warehouse
• Fully fitted first floor office space
• Comfort cooling/heating system to offices
• Allocated car parking spaces (69 spaces)
• Allocated cycle parking (24 spaces)
TRANSPORT
ROAD
A3 - 0.5m - 10mins
Guildford Train Station - 1.7m - 5mins
M25 (Junction 10) - 9m - 15mins
Central London - 30m - 70mins
Southampton Docks - 57m - 65mins
RAIL
London Waterloo - 35 mins
Reading - 37 mins
Gatwick - 46 mins
AIR
London Gatwick - 33 miles
London Heathrow - 24 miles
Brochures
Amplify Guildford, Midleton Industrial Estate Road, Guildford, GU2 8XW
NEAREST STATIONS
Distances are straight line measurements from the centre of the postcode- Guildford Station0.7 miles
- London Road Station0.9 miles
- Shalford Station2.4 miles
Notes
Disclaimer - Property reference 336884-2. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by JLL, Stockley Park - Industrial. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.
Map data ©OpenStreetMap contributors.



