Properties To Rent by Michael Graham, Woburn Sands, including let agreed
7 results
A modern three bedroom end of terrace house, situated approximately 5 minutes’ walk from Woburn Sands railway station. This property is in a quiet location and has accommodation of approximately 920 sq. ft. This includes - on the ground floor - a sitting room, kitchen/dining room and two p...
A Victorian double fronted detached five bedroom house with parking, a mature garden in a village location This period property has 3,782 sq. ft. accommodation. On the ground floor there is an entrance hall, three reception rooms, a kitchen/breakfast room, a further breakfast room, a utility room...
A modern three bedroom detached home with garage and parking in a village location. This property has 1,868 sq. ft. of accommodation arranged over two floors. On the ground floor there is a sitting room, a dining room, a study, a fitted kitchen with appliances, a utility room, and a cloakroom. ...
An Edwardian three bedroom semi-detached house on a 'no through road' in a village location within walking distance to the local primary school. This property has 818 sq. ft. of accommodation including two reception rooms with modern gas fires, a kitchen/breakfast room with bi fold doors, a utili...
A modern three bedroom semi detached house with an enclosed rear garden within walking distance of Woburn Sands High Street. This property has 829 sq. ft. of accommodation arranged over two floors. On the ground floor there is an entrance hall, a sitting/dining room and a kitchen with appliances ...
A modern three bedroom detached house on the Parklands development in Woburn Sands A three bedroom detached house with two reception rooms, a fully fitted kitchen/dining room, two double bedrooms, an en suite shower room, and a family bathroom. There is a garden and residents parking. Minimum t...
An Edwardian brick under tile refurbished three bedroom mid terrace house with a mature garden close to Woburn Sands High Street. This property has 1,040 sq. ft. of accommodation arranged over three floors and includes period features such as original panelled doors and exposed internal brickwork...