Unit 5 comprises a self-contained industrial unit of steel portal frame construction, constructed to an eaves height of approximately 4.7 metres, having blockwork internal walls and external brick/clad elevations. Cladding has also been used to surmount the pitched roof above which incorporates certain translucent panels to provide natural light. The unit has recently been redecorated and further benefits from LED lighting, 3 phase electricity, security/fire alarms, together with a manual roller shutter door leading to a mono-pitched loading bay and access door, with an enclosed yard area to the side. There are two mezzanine storage areas both benefiting from separate staircases.
Externally there is allocated car parking to the front of the property and an enclosed yard area to the rear.