The property comprises a semi-detached, twin-bay industrial unit of steel portal frame construction, with profile sheet cladding and a cement sheet roof incorporating translucent rooflights.
A single-storey office block is located on the side elevation, constructed of traditional masonry with uPVC double-glazed windows and doors beneath a flat asphalt roof.
Internally, the property provides two interconnected warehouse units (B and C). Warehouse B (the right-hand unit) includes a front-loading door and single storey block containing a WC and store and connects to Unit C via an opening in the party wall.
Unit C (the left-hand unit) offers open-plan warehouse space with rear cellular areas providing welfare facilities, storage and a works office. A mezzanine floor above, open to the warehouse, is accessed via a timber staircase.
Both warehouses benefit from painted concrete floors, painted blockwork walls and lined roof panels.
The main office accommodation includes an open-plan office, kitchen, manager's office, reception, meeting room and additional office space. The specification includes carpet floor coverings, suspended ceilings inclusive of strip and panel lighting and painted plaster walls. The offices and welfare areas are centrally heated with the warehouse benefitting from warm air blowers.
Externally, the site has estate road access with parking to the front and side within a tarmacadam forecourt.