
Arrowsmith Road, Wimborne, Dorset, BH21

- PROPERTY TYPE
Detached
- BEDROOMS
4
- BATHROOMS
3
- SIZE
4,692 sq ft
436 sq m
- TENUREDescribes how you own a property. There are different types of tenure - freehold, leasehold, and commonhold.Read more about tenure in our glossary page.
Freehold
Key features
- Set in 5.6 acres of secluded park like grounds
- No onward chain
- Spectacular indoor swimming pool complex
- Electric gates and entire boundary fully fenced for security
- Immaculate presentation throughout
- EPC Rating = C
Description
Description
The handsome elevations are of self-colour render and tile hanging under a tiled roof. The house is presented in immaculate order throughout and offers generous room sizes, mains gas fired central heating, double glazed UPVC, oak finished internal doors, and high quality modern kitchen and bathroom fittings.
The impressive double height reception hall has a galleried landing and vaulted ceiling above, cloaks storage cupboard and guest cloakroom. Double doors open into the drawing room with limestone fireplace and door to the garden room, with windows on three sides providing beautiful garden views. The study has a desk and built in storage. The family room has a limestone fireplace with log burner and opens into the dining room, and then into the fitted kitchen/ breakfast room. The utility room has a matching range of units, sink, plumbing for washer and dryer, and integrated freezer. The rear hall/ boot room has doors to the drive, garden, gardener’s wc and garage. Leading off is the superb purpose built Indoor Pool Complex with heated swimming pool, electric cover, changing rooms, cloakroom, shower room and plant room housing the boiler, filtration and heat recovery equipment. The poolside entertaining area has French doors to the terrace.
From the hall a fine staircase leads up to the galleried landing with vaulted ceiling. The main suite includes a large bedroom with a beautiful view across the grounds, fitted dressing room, extensive and secluded sun balcony, and a luxurious fully tiled bathroom with bath, separate glazed shower, twin basins and WC. The guest suite has built in bedroom furniture and an en suite shower room, and the two further double bedrooms share the spacious family bathroom, with bath and separate shower, twin basins and WC.
Electrically operated gates and a sweeping brick paviour driveway lead to a large parking and turning area at the front of the house. The Double Garage has an electric door, useful store room, gas fired central heating boiler and water softener. The spectacular grounds are an outstanding feature, with mature trees and shrubs providing complete seclusion. They are mainly lawned with numerous rhododendrons, and a charming woodland walk. At the rear is a paved terrace adjacent to the swimming pool and kitchen, perfect for summer entertaining. There is a large garden store, and a loft room above the pool complex approached by an external staircase, this room has services in place to be converted into living accommodation/an annexe, subject to any necessary permissions being obtained.
Location
Arrowsmith Road is a sought after location characterised by individual quality homes set in extensive wooded grounds.
The Minster town of Wimborne having a branch of Waitrose, many cafes bars and restaurants, and the Tivoli theatre together with. Broadstone village centre for day to day shops and an M&S Food are both about 2.5 miles drive.
The centre of the Poole for shopping, entertainment and recreational facilities is about 5.5 miles, with Poole Harbour, renowned for the beach at Sandbanks, yachting and water sports, is about seven miles.
Trains run from Poole to London Waterloo and the A31 leading on to the M27/M3 to London can be joined at Wimborne.
State schools are in Wimborne and Broadstone, with renowned independent schools in the wider area including Canford, Bryanston, Dumpton, Castle Court and Talbot Heath.
Sporting facilities include the David Lloyd Club in Poole, BH Live Active in Corfe Mullen, and championship golf courses in Broadstone, Ferndown and Parkstone.
Fine walking and cycling can be enjoyed on the heathland around Broadstone, and the 16.5 mile Castleman Trailway passes through the village.
Square Footage: 4,692 sq ft
Acreage: 5.59 Acres
Directions
From Wimborne take the A349 south in the direction of Poole. At the traffic lights at the top of Gravel Hill turn left into Queen Anne Drive (A341) and proceed for one mile, turning right into Arrowsmith Road at the next traffic lights. The lane leading to the entrance to Gleddoch can be found on your left after about 500m.
Additional Info
Council Tax Band H
All mains services are connected.Please note that the working condition of any of the services or kitchen appliances have not been checked by the agents but at the time of taking particulars we were informed they were all in working order
Brochures
Web DetailsParticulars- COUNCIL TAXA payment made to your local authority in order to pay for local services like schools, libraries, and refuse collection. The amount you pay depends on the value of the property.Read more about council Tax in our glossary page.
- Band: H
- PARKINGDetails of how and where vehicles can be parked, and any associated costs.Read more about parking in our glossary page.
- Yes
- GARDENA property has access to an outdoor space, which could be private or shared.
- Yes
- ACCESSIBILITYHow a property has been adapted to meet the needs of vulnerable or disabled individuals.Read more about accessibility in our glossary page.
- Ask agent
Arrowsmith Road, Wimborne, Dorset, BH21
Add an important place to see how long it'd take to get there from our property listings.
__mins driving to your place
Get an instant, personalised result:
- Show sellers you’re serious
- Secure viewings faster with agents
- No impact on your credit score
Your mortgage
Notes
Staying secure when looking for property
Ensure you're up to date with our latest advice on how to avoid fraud or scams when looking for property online.
Visit our security centre to find out moreDisclaimer - Property reference WBS240219. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Savills, Wimborne. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.
*This is the average speed from the provider with the fastest broadband package available at this postcode. The average speed displayed is based on the download speeds of at least 50% of customers at peak time (8pm to 10pm). Fibre/cable services at the postcode are subject to availability and may differ between properties within a postcode. Speeds can be affected by a range of technical and environmental factors. The speed at the property may be lower than that listed above. You can check the estimated speed and confirm availability to a property prior to purchasing on the broadband provider's website. Providers may increase charges. The information is provided and maintained by Decision Technologies Limited. **This is indicative only and based on a 2-person household with multiple devices and simultaneous usage. Broadband performance is affected by multiple factors including number of occupants and devices, simultaneous usage, router range etc. For more information speak to your broadband provider.
Map data ©OpenStreetMap contributors.