
Land for sale
Frampton Park, Dorchester, Dorset, DT2
- PROPERTY TYPE
Land
- SIZE
488,308 sq ft
45,365 sq m
Key features
- 11.21 acres (4.54 hectares) of Pasture Land
- EPC Rating = C
Description
Description
LOT 2 –
11.21 acres (4.54 hectares) of Pasture Land
A conveniently sized parcel of attractive, south facing pasture land. A productive field currently used for forage production.
Acreage: 11.21 Acres
Additional Info
In the event that Lot 2 is sold to a purchaser other than the purchaser of Lot 1, a right of access over the northern edge of Lot 3 will be granted as shown hatched red on the sale plan. In this instance, the purchaser of Lot 2 will install a gate at stockproof point “A” on the sale plan within 6 weeks of completion.
Brochures
Web DetailsFrampton Park, Dorchester, Dorset, DT2
NEAREST STATIONS
Distances are straight line measurements from the centre of the postcode- Maiden Newton Station2.9 miles
- Dorchester West Station4.7 miles
- Dorchester South Station5.0 miles
Notes
Disclaimer - Property reference WBS250098. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Savills, Wimborne. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.
Map data ©OpenStreetMap contributors.





