Skip to content
Get brand editions for Andrews Estate Agents, Winterbourne

Down Road, Winterbourne Down, Bristol, BS36

PROPERTY TYPE

Bungalow

BEDROOMS

2

BATHROOMS

1

SIZE

994 sq ft

92 sq m

TENURE
Describes how you own a property. There are different types of tenure - freehold, leasehold, and commonhold.Read more about tenure in our glossary page.

Freehold

Key features

  • Cash buyers only
  • Circa 0.4 acre plot
  • Detached
  • Extensive garden
  • View over the Folly Brook
  • Gated driveway
  • Council Tax Band C

Description

A detached bungalow set in circa 0.4 of an acre in the South Gloucestershire countryside, owned by the same family since the 1950’s.
This property is ideal for redevelopment… subject to the relevant planning permissions… with potential for you to build your new forever home in the countryside.
Offering a real countryside feel, with no immediate neighbour, a landscaped upper garden with a gated driveway and off-street parking for several cars, that drops down to a peaceful lower level orchard with Plum and Apple trees bounded by The Folly Brook and regular visits from the local wildlife.
Currently configured as a two bed (previously three bed) and of a non-standard construction dwelling, therefore available to cash only buyers.
Located in a rural area to the north of Bristol, with excellent access to local shops, road and rail transport links and facilities, yet close to riverside walks, golf courses and country pubs.


COUNCIL TAXA payment made to your local authority in order to pay for local services like schools, libraries, and refuse collection. The amount you pay depends on the value of the property.Read more about council Tax in our glossary page.
Band: C
PARKINGDetails of how and where vehicles can be parked, and any associated costs.Read more about parking in our glossary page.
Yes
GARDENA property has access to an outdoor space, which could be private or shared.
Yes
ACCESSIBILITYHow a property has been adapted to meet the needs of vulnerable or disabled individuals.Read more about accessibility in our glossary page.
Ask agent

Down Road, Winterbourne Down, Bristol, BS36

Approximate location

Add an important place to see how long it'd take to get there from our property listings.

__mins driving to your place

Affordability

Monthly repayments£1,761
Property: £ 349,995
Deposit: £ 35,000
Interest rate: 5.36%
Term: 30 years
Powered byNatwest
These results are estimates and are only intended as a guide. Make sure you obtain accurate figures from your lender before committing to any mortgage. Your home may be repossessed if you do not keep up repayments on a mortgage.
Renovation potential
Recently sold & under offer
See similar nearby properties
Get brand editions for Andrews Estate Agents, Winterbourne

About Andrews Estate Agents, Winterbourne

10 High Street, Winterbourne, Bristol, BS36 1JN

About Us

With roots dating back to 1946, Andrews has evolved into a prominent property specialist in Southern England. Boasting 44 sales and lettings branches, our growth is underpinned by a robust network of sales, lettings, and mortgage advisors based in Bath, Bristol, Gloucestershire, Kent, London, Oxfordshire and Surrey.

What sets us apart is our unique ownership structure. We're 100% owned by a charitable trust, so giving back and helping out communities in need is a huge part of Andrews. A large slice of our profits goes to causes that tackle big issues in our communities and overseas, like education, employment and shelter.

Since 1994 we've contributed over £10 million to fund social and innovative charitable enterprises. Stepping into our eighth decade in business it continues to be an integral part of our company identity and ideals.

Check how much you can borrow

Whether you're buying by yourself or with someone else, you can:

  • Receive a result instantly
  • Get viewings faster with agents
  • Check with no impact on your credit score
Powered byNatwest
Two happy people looking at phone

Notes

These notes are private, only you can see them.

Staying secure when looking for property

Ensure you're up to date with our latest advice on how to avoid fraud or scams when looking for property online.

Visit our security centre to find out more

Disclaimer - Property reference WBS180065. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Andrews Estate Agents, Winterbourne. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.

*This is the average speed from the provider with the fastest broadband package available at this postcode. The average speed displayed is based on the download speeds of at least 50% of customers at peak time (8pm to 10pm). Fibre/cable services at the postcode are subject to availability and may differ between properties within a postcode. Speeds can be affected by a range of technical and environmental factors. The speed at the property may be lower than that listed above. You can check the estimated speed and confirm availability to a property prior to purchasing on the broadband provider's website. Providers may increase charges. The information is provided and maintained by Decision Technologies Limited.
**This is indicative only and based on a 2-person household with multiple devices and simultaneous usage. Broadband performance is affected by multiple factors including number of occupants and devices, simultaneous usage, router range etc. For more information speak to your broadband provider.