Buildings 9-13 Catalyst - Phase 3, Wendlebury Road, Bicester, OX25 2BX

POA

Size

16,554 - 109,819

Lease length

Ask agent

EPC

Ask agent

Parking

Ask agent

Spaces

5

Space
Space use
Size
Availability
Size
Price
Ask agent
Price per
Ask agent
Primary use
Distribution warehouse

No floor / site plan

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Coming Soon - Phase 3 Catalyst Bicester Wendlebury Road Bicester OX25 2BX

Additional information

Clear height
Ask agent
Yard depth
Ask agent
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent
Size
Price
Ask agent
Price per
Ask agent
Primary use
Distribution warehouse

No floor / site plan

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Coming Soon - Phase 3 Catalyst Bicester Wendlebury Road Bicester OX25 2BX

Additional information

Clear height
Ask agent
Yard depth
Ask agent
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent
Size
Price
Ask agent
Price per
Ask agent
Primary use
Distribution warehouse

No floor / site plan

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Coming Soon - Phase 3 Catalyst Bicester Wendlebury Road Bicester OX25 2BX

Additional information

Clear height
Ask agent
Yard depth
Ask agent
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent
Size
Price
Ask agent
Price per
Ask agent
Primary use
Distribution warehouse

No floor / site plan

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Coming Soon - Phase 3 Catalyst Bicester Wendlebury Road Bicester OX25 2BX

Additional information

Clear height
Ask agent
Yard depth
Ask agent
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent
Size
Price
Ask agent
Price per
Ask agent
Primary use
Distribution warehouse

No floor / site plan

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Coming Soon - Phase 3 Catalyst Bicester Wendlebury Road Bicester OX25 2BX

Additional information

Clear height
Ask agent
Yard depth
Ask agent
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent

Key features

  • Grade A open plan offices at first floor
  • building design to facilitate easy additional office, technical and lab area fit-out at ground floor, with 4 m height from slab to underside of insulation below the first floor
  • EPC Rating A and BREEAM Excellent
  • photovoltaics to supplement energy use and air source heat pumps
  • 8 metre minimum clear internal height to production areas
  • full height glazing to office elevations and micro lined facade cladding
  • maximised natural light to the production areas with 12% roof lights and translucent wall panels
  • FM2 floor tolerance in production area designed for uniform loads of 50 kn/m2
  • large dedicated car parks with parking at a ratio of approximately 1:382 sq ft (1:35 sq m
  • dedicated service yards with loading doors to production areas

Description

Description
Phases 1 comprising four impressive technology buildings and the David Lloyd health and racquets club was completed in 2022 and attracted Evolito
and YASA, both ground-breaking technology manufacturing companies. Phase 2 was completed in 2024 and provides a further four detached technology buildings which were quickly taken by Tesla and the luxury EV company Forseven. To date 181,000 sq ft has been developed for the technology and advanced manufacturing sector with the new occupiers recognising the high quality building designs, the excellent location, the breadth of nearby staff amenities and the advantages of occupying alongside likeminded companies. Phase 3 Catalyst will commence shortly to provide a further 110,000 sq ft in five technology buildings for occupation in early 2026. Phase 4 at Catalyst remains available to accommodate
bespoke requirements of up to 128,500 sq ft. Ultimately, Catalyst will provide 420,000 sq ft of technology accommodation.

Location
Welcome to Catalyst Bicester, the new sustainable business community designed for technology industries, advanced manufacturing and high-performance engineering companies. Catalyst Bicester is more than just a technology park; it is an impressive gateway to Bicester connecting people to their work, homes and shops by excellent pedestrian, cycle, bus and train links. The development includes a new David Lloyd health and fitness centre, parkland landscaping, all alongside the new Holiday Inn hotel. Phases 1 and 2 are complete and fully let to Evolito, YASA, Tesla and Forseven; a luxury EV design and manufacturing company. Phase 3 Catalyst will comprise a further 110,000 sq ft and is about to commence for occupation in Spring 2026. Causing a positive change Phase 4 has recently been granted planning permission for 128,500 sq ft and at this stage bespoke occupier requirements could be satisfied. Buildings at Catalyst are highly sustainable with a BREEAM rating of Excellent, EPC rating A and are set in an extensive parkland environment.
Additional information
Let type
Ask agent
Let contract length
Ask agent
Status
Available
Date available
17 February 2025
Service charge
Ask agent
Business rates
Ask agent
Use class
B2
Energy performance certificate: Ask agent

An Energy Performance certificate helps you understand the current energy efficiency of a property.

Read more about EPC requirements

Ask agent

Environmental data
BREEAM rating
Ask agent
Environmental description
Ask agent
Read more about energy considerations for commercial property

Buildings 9-13 Catalyst - Phase 3, Wendlebury Road, Bicester, OX25 2BX

NEAREST STATIONS

National Rail

Bicester Town Station

2 miles

National Rail

Bicester North Station

2.46 miles

About CBRE - Birmingham, Birmingham Office

CBRE - Birmingham, Birmingham Office logo

Your search history

You have no recent searches

Disclaimer - Property reference 280840-2. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by CBRE - Birmingham, Birmingham Office. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.