GTH, Yeovil

There was an issue loading the content. Try to refresh the page.

There was an issue loading the content. Try to refresh the page.

There was an issue loading the content. Try to refresh the page.

There was an issue loading the content. Try to refresh the page.

Description

An industrial development site with planning permission for 72,000 sq ft suitable for Class B1, B2 or B8 uses.
GTH, Yeovil

Ask for more details or arrange a viewing today

Contact Agent

There was an issue loading the content. Try to refresh the page.

Brochure

Phase 2 Bridge Park, Pylle, Shepton Mallet, Somerset, BA4

NEAREST STATIONS

National Rail

Castle Cary Station

3.47 miles

National Rail

Bruton Station

4.94 miles

There was an issue loading the content. Try to refresh the page.

Your search history

You have no recent searches

There was an issue loading the content. Try to refresh the page.