Edinburgh, EH3
Size
174,240 - 19,602,000
Tenure
Ask agent
EPC
Ask agent
Parking
Ask agent
- Primary use
- Data centre
- Other use(s)
- Commercial development, Land
No floor / site plan
Key features
- Fast-track route from land control to a first live hall
- Defined grid pathway aligned to early energisation
- Planning-ready land that shortens pre-construction timelines
- Sites from 4 to 450 acres to match your first-phase brief
- Portfolio capacity from single-digit MW to hundreds of MW
- Cool climate for extended free cooling and lower running costs
- Direct access to Scotland's record renewable generation
- Positioned for UK sovereign and AI compute demand
Description
Each opportunity brings together land control, a defined grid pathway and planning readiness: the three foundations that most often hold a new programme back. With all three in place, a hyperscaler or funder can move decisively from site selection to construction, and on to a first operational hall on an accelerated timetable.
The offer is built around flexibility. Sites range from 4 to 450 acres (174,240 to 19,602,000 sq ft), and capacity across the portfolio runs from single-digit megawatts to hundreds of megawatts. That breadth supports a focused first phase now, with the land and power strategy to grow into a multi-hall campus as demand builds.
Scotland's energy position is compelling. A record 38.5 TWh of renewable electricity was generated in Scotland in 2025, and the country continues to produce more power than it needs, with net electricity exports of 20.8 TWh in the same year. For operators with demanding sustainability commitments, that is a decisive advantage.
The climate adds a further edge. Cool temperatures throughout the year support extended free cooling, reducing energy demand and operating costs over the life of the asset.
Demand is accelerating. UK sovereign compute and AI workloads need secure, scalable, low-carbon capacity on home soil, and the East of Scotland is ready to deliver it. These are sites prepared to the standard any international data centre operator expects, with fundamentals suited to long-term institutional ownership.
The land suits B1, B2, B8 and sui generis uses, giving full flexibility across data halls, ancillary accommodation and energy infrastructure. Price is available on application.
For hyperscaler site-selection and real-estate teams, and for infrastructure funders seeking a credible route to a hyperscale tenant, this is an opportunity to secure early-mover advantage on Scotland's East coast. Enquire through Rightmove today to request the confidential investment pack.
Source: Scottish Government, Energy Statistics for Scotland
- Service charge
- Ask agent
- Business rates
- Ask agent
- Use class
- 4, 5, 6
- Listed building
- Ask agent
An Energy Performance certificate helps you understand the current energy efficiency of a property.
Read more about EPC requirementsAsk agent
- BREEAM rating
- Ask agent
- Environmental description
- Ask agent
Brochure
Edinburgh, EH3
Your search history
You have no recent searches
Disclaimer - Property reference SYLDCA. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Sylvyn, Crail, Fife. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.






