Sylvyn, Crail, Fife

Edinburgh, EH3

POA

Size

174,240 - 19,602,000

Tenure

Ask agent

EPC

Ask agent

Parking

Ask agent

Primary use
Data centre
Other use(s)
Commercial development, Land

No floor / site plan

Key features

  • Fast-track route from land control to a first live hall
  • Defined grid pathway aligned to early energisation
  • Planning-ready land that shortens pre-construction timelines
  • Sites from 4 to 450 acres to match your first-phase brief
  • Portfolio capacity from single-digit MW to hundreds of MW
  • Cool climate for extended free cooling and lower running costs
  • Direct access to Scotland's record renewable generation
  • Positioned for UK sovereign and AI compute demand

Description

In today's data centre market, the scarcest commodity is not land. It is time. This East of Scotland portfolio has been assembled to give that time back to the occupier.

Each opportunity brings together land control, a defined grid pathway and planning readiness: the three foundations that most often hold a new programme back. With all three in place, a hyperscaler or funder can move decisively from site selection to construction, and on to a first operational hall on an accelerated timetable.

The offer is built around flexibility. Sites range from 4 to 450 acres (174,240 to 19,602,000 sq ft), and capacity across the portfolio runs from single-digit megawatts to hundreds of megawatts. That breadth supports a focused first phase now, with the land and power strategy to grow into a multi-hall campus as demand builds.

Scotland's energy position is compelling. A record 38.5 TWh of renewable electricity was generated in Scotland in 2025, and the country continues to produce more power than it needs, with net electricity exports of 20.8 TWh in the same year. For operators with demanding sustainability commitments, that is a decisive advantage.

The climate adds a further edge. Cool temperatures throughout the year support extended free cooling, reducing energy demand and operating costs over the life of the asset.

Demand is accelerating. UK sovereign compute and AI workloads need secure, scalable, low-carbon capacity on home soil, and the East of Scotland is ready to deliver it. These are sites prepared to the standard any international data centre operator expects, with fundamentals suited to long-term institutional ownership.

The land suits B1, B2, B8 and sui generis uses, giving full flexibility across data halls, ancillary accommodation and energy infrastructure. Price is available on application.

For hyperscaler site-selection and real-estate teams, and for infrastructure funders seeking a credible route to a hyperscale tenant, this is an opportunity to secure early-mover advantage on Scotland's East coast. Enquire through Rightmove today to request the confidential investment pack.

Source: Scottish Government, Energy Statistics for Scotland
Sylvyn, Crail, Fife

Ask for more details or arrange a viewing today

Contact Agent
Additional information
Service charge
Ask agent
Business rates
Ask agent
Use class
4, 5, 6
Listed building
Ask agent
Energy performance certificate: Ask agent

An Energy Performance certificate helps you understand the current energy efficiency of a property.

Read more about EPC requirements

Ask agent

Environmental data
BREEAM rating
Ask agent
Environmental description
Ask agent
Read more about energy considerations for commercial property

Brochure

Edinburgh, EH3

NEAREST STATIONS

National Rail

Edinburgh Waverley Station

0.62 miles

National Rail

Haymarket Station

1.15 miles

National Rail

Slateford Station

2.78 miles

Your search history

You have no recent searches

Disclaimer - Property reference SYLDCA. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Sylvyn, Crail, Fife. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.