Sylvyn, Crail, Fife

Glasgow, G1

POA

Size

174,240 - 19,602,000

Tenure

Ask agent

EPC

Ask agent

Parking

Ask agent

Primary use
Data centre
Other use(s)
Commercial development, Land

No floor / site plan

Key features

  • Campus-scale sites of up to 450 acres for multi-hall growth
  • Phased programme from first hall through to full campus
  • Portfolio capacity that scales to hundreds of MW
  • Room for dedicated on-site campus energy infrastructure
  • Land control and a defined grid pathway to de-risk delivery
  • Planning readiness to support a long-term build programme
  • Scotland's renewable surplus underpins low-carbon operations
  • Cool climate delivers free cooling across every hall

Description

Hyperscale growth is measured in campuses, not buildings. This West of Scotland portfolio offers the land, power strategy and planning foundations to deliver a multi-hall programme at genuine scale.

Sites extend to as much as 450 acres, within a portfolio ranging from 4 to 450 acres (174,240 to 19,602,000 sq ft). Capacity across the portfolio runs from single-digit megawatts to hundreds of megawatts, giving an occupier the scope to plan a full campus from day one rather than assembling it piece by piece.

The programme is designed to phase with demand. A first hall establishes an operational presence, and further halls follow on the same land as requirements grow, each supported by a coherent masterplan for power, cooling and access.

Energy infrastructure sits at the heart of the offer. The scale of these sites allows space for dedicated campus energy infrastructure alongside the data halls, while land control, a defined grid pathway and planning readiness give investors confidence in the delivery route.

Few locations can match Scotland's renewable platform. The country had 17.9 GW of renewable electricity capacity in 2025, with a further 84.8 GW of renewable projects in the planning pipeline at the end of that year. That depth of low-carbon supply is a powerful foundation for a campus intended to run for decades.

A cool climate strengthens the case further, supporting free cooling across every hall and keeping operating costs firmly under control as the campus expands.

The timing is right. UK sovereign compute and AI workloads demand secure, large-scale capacity onshore, and a West of Scotland campus is ready to meet that requirement for any global data centre operator.

The land suits B1, B2, B8 and sui generis uses, accommodating data halls, ancillary buildings and energy infrastructure within one campus. Price is available on application.

For hyperscaler site-selection and real-estate leads, and for infrastructure funders building a long-term platform with a hyperscale partner, this is a rare chance to secure campus-scale land in Scotland's West. Enquire through Rightmove today to request the confidential investment pack.

Source: Scottish Government, Energy Statistics for Scotland
Sylvyn, Crail, Fife

Ask for more details or arrange a viewing today

Contact Agent
Additional information
Service charge
Ask agent
Business rates
Ask agent
Use class
4, 5, 6
Listed building
Ask agent
Energy performance certificate: Ask agent

An Energy Performance certificate helps you understand the current energy efficiency of a property.

Read more about EPC requirements

Ask agent

Environmental data
BREEAM rating
Ask agent
Environmental description
Ask agent
Read more about energy considerations for commercial property

Brochure

Glasgow, G1

NEAREST STATIONS

National Rail

Glasgow Queen Street Station

0.06 miles

London DLR

Buchanan Street Station

0.29 miles

National Rail

Glasgow Central Station

0.39 miles

Your search history

You have no recent searches

Disclaimer - Property reference SYLDCB. The information displayed about this property comprises a property advertisement. Rightmove.co.uk makes no warranty as to the accuracy or completeness of the advertisement or any linked or associated information, and Rightmove has no control over the content. This property advertisement does not constitute property particulars. The information is provided and maintained by Sylvyn, Crail, Fife. Please contact the selling agent or developer directly to obtain any information which may be available under the terms of The Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 or the Home Report if in relation to a residential property in Scotland.