Properties For Sale in LU4
** URBAN & RURAL ** NO CHAIN ** KITCHEN/BREAKFAST ROOM ** LOUNGE/DINER ** THREE FIRST FLOOR BEDROOM ** FRONT & REAR GARDENS ** DRIVEWAY ** Offered to the market for the first time since being built in the 1960s, this much-loved three-bedroom semi-detached family home presents a...
Property Reference: 10511 Imagine stepping out of your front door and being at the railway station in just two minutes. Then imagine returning home to over 3,850 sq ft (358 sq m) of beautifully proportioned property, a spectacular open-plan family kitchen, a completely self-contained annex and a...
Key features
- Substantial detached executive family home offering approximately 3,854 sq ft (358 sq m) of exceptionally versatile accommodation.
- Outstanding commuter location on an attractive tree-lined avenue, just 200 metres (approximately 2 minutes' walk) from Leagrave Thameslink station.
- Genuine self-contained one-bedroom annex with its own fitted kitchen/living room, bathroom and independent driveway entrance, plus internal access to the main house.
A RARELY AVAILABLE ESTABLISHED DETACHED HOUSE SET IN ABOUT TWO ACRES, BUILT IN 1911 AND HAVING BEEN IN THE SAME FAMILY OWNERSHIP SINCE CONSTRUCTION. THE PROPERTY IS BEING SOLD WITH THE BENEFIT OF NO ONWARD CHAIN. THE PROPERTY Rosedale is a substantial Edwardian house set in appro...
DescriptionHUGE PLOT , 5 bedroom detached family home, large outbuilding, modern and contemporary internally, potential development plot.Indigo Residential is proud to offer this expansive 5-bedroom detached home on one of Challney"s most sought-after roads.
Connells Leagrave present a large family home located within walking distance to Leagrave train station for commuting into London. Toddington Road is a MUST VIEW property to see the true size and space the property has to offer! Call Connells Leagrave to arrange your appointment today!
An excellent opportunity to acquire a substantial freehold commercial property situated on Leagrave Road, Luton, in a busy and well-established shopping parade benefiting from strong pedestrian footfall and a prominent trading location. The property comprises a large commercial unit at ground-...
Presented to an exceptional standard throughout, this truly outstanding six-bedroom detached residence in the highly sought-after Leagrave area of Luton offers the perfect blend of luxury, space, and contemporary family living. Lovingly and thoughtfully extended and completely renovated by the cu...
Description***HEAVILY EXTENDED FAMILY HOME***GREAT FAMILY HOME benefiting from THREE SEPARATE RECEPTION ROOMS, THREE EN-SUITES and GROUND FLOOR BEDROOM.DESCRIPTION:Internally, the property briefly comprises an entrance hall, a cloakroom with WC and wash hand basin, a lounge featuring a modern fir...
Key features
- Six Bedrooms
- Three Separate Reception Rooms
- Low Maintenance Rear Garden
Key features
- 5/6 Bedroom
- Semi detached Chalet Bungalow
- Refurbished throughout
This Property is Being sold Purplebricks Secure Sale. Three-bedroom semi-detached home in a popular residential area of Luton, offered with the added benefit of a brand-new, self-contained one-bedroom detached bungalow, providing excellent potential for multigenerational living, extended family...
Key features
- BUY IT NOW Option - Reservation Fee Applies
- BRAND NEW One Bedroom Bungalow On Separate Title
- Stunning 3 Bed Family Home
Discover this stunning, brand new, chain free three double bedroom detached home in a quiet Leagrave close. Boasting two en-suites, a family bathroom, two reception rooms, and off-road parking, it offers modern living with excellent transport links.
Key features
- Chain Free
- Brand New Detached Home
- Quiet Residential Close In Leagrave
Key features
- ***GUIDE PRICE £500,000-£525,000***
- FIVE-BEDROOM SEMI-DETACHED FAMILY HOME
- DOUBLE SIDE AND REAR EXTENSIONS
A spacious and versatile five-bedroom semi-detached property situated in a popular residential area of Mayne Avenue, Luton, offering generous accommodation suited to larger families or buyers seeking flexible living space. The property provides three reception areas, five bedrooms, thr...
Key features
- Extended 5 bedroom family home
- Recently refurbed
- 5 minute walk from Leagrave Railway Station
Key features
- ***GUIDE PRICE £500,000-£550,000***
- 4-5 BED PROPERTY
- CONVERTED GARAGE WITH TWO ROOMS AND BATHROOM
URBAN AND RURAL LEAGRAVE * STUNNING CONDITION THROUGHOUT * EXTENDED * 0.4 MILES TO LEAGRAVE TRAIN STATION * IDEAL FOR A LARGE FAMILY * REFITTED KITCHEN AND BATHROOM * LARGE REAR GARDEN * 25FT GARAGE Located within close proximity to all local amenities and approximately 0.4 miles from ...
Key features
- Detached
- Three Bedrooms
- Refitted Kitchen and Bathroom
Connells Leagrave present a large four bedroom family home located within walking distance to Leagrave train station. Capron Road offers size and space in abundance with modern features including a cloakroom, ensuite to master bedroom and open plan living. Call Connells Leagrave today!
Key features
- Four Bedrooms
- Detached
- Walking Distance To Leagrave Train Station
Occupying a substantial plot on the highly sought-after Locarno Avenue, this detached three-bedroom bungalow offers spacious and versatile accommodation with exceptional potential. Benefiting from generous gardens, ample parking, and a prime location close to local amenities and transport links,
Key features
- Three Bedrooms
- Detached Bungalow
- Heavily Extended
Recently constructed to the highest standard this four bedroom detached property combines spacious rooms sizes throughout with tasteful decor, we highly advise an internal inspection as to fully appreciate the calibre of this designer residence. The property briefly comprises; entrance hall leadi...
Step into space, style, and simplicity with this nearly new four-bedroom detached family home — beautifully presented and ready to move straight into. With modern finishes throughout, a private garage, and the huge advantage of being chain free, this is stress-free moving at its best
Key features
- Nearly new four-bedroom detached family home
- Spacious lounge and contemporary open-plan kitchen/dining area
- Principal bedroom with modern ensuite shower room
Step into space, style, and simplicity with this nearly new four-bedroom detached family home — beautifully presented and ready to move straight into. With modern finishes throughout, a private garage, and the huge advantage of being chain free, this is stress-free moving at its best
Key features
- Nearly new four-bedroom detached family home
- Spacious lounge and contemporary open-plan kitchen/dining area
- Principal bedroom with modern ensuite shower room









































