Properties For Sale in MK17
We are delighted to present this beautifully presented home situated in a quiet position at the end of a village lane adjoining open countryside. Some rare features include a gated driveway, double garage and solar panels making it energy efficient. You have a spacious kitchen/diner with integrat...
Could this be your next family home? This three bedroom semi detached house is just a short walk from the shops and eateries in Woburn Sands. It would make a great family home, with a good size kitchen/diner and two shower rooms and also with local schools nearby
Welcome to `Wisteria` an absolutely charming Victorian semi detached home arranged over four floors. This delightful property showcases a tasteful blend of modern living and period character, featuring neutral decor, high ceilings, large bay windows, and elegant fireplaces.
Beautiful Four-Bedroom Detached Home with Lake Views in Woburn Sands Perfectly positioned opposite a tranquil lake, this stunning four-bedroom detached family home enjoys wonderful views and direct access to picturesque walks, all within the highly sought-after community of Woburn Sand...
The Cambridge is an instantly impressive family home from Redrow. Energy efficiency is provided through the use of an air source heat pump, with other exceptional features including private parking, underfloor heating and ultrafast broadband. Three bedrooms, Study and the family bathroom all off...
Spread over three storeys and with an abundance of space, The Lincoln is a stunning semi-detached home designed for modern living. As an Eco Electric property, this home offers exceptional levels of efficiency - with even underfloor heating provided as standard - powered by an air source heat pum...
A character four bedroom detached house set on 2.5-acre plot with gardens, paddocks, and a range of outbuildings including a stable block, garaging and off street parking in a rural position on the outskirts of a village. This brick under a mansard roof property is approached via a block paved dr...
ATTENTION FIRST TIME BUYERS | VIEWINGS HIGHLY RECOMMENDED | CUL-DE-SAC LOCATION | ALLOCATED PARKING Alexander & Co welcome to the market this two-bedroom EXTENDED, end of terrace home, situated in a quiet, tucked away cul-de-sac in the desirable Village of Mursley. The g...
*** REGISTER YOUR INTEREST : Viewing Day on Saturday 16th August : 11.00am - 1.00pm : REGISTER YOUR INTEREST *** - Benefiting from AIR CONDITIONING - Bed 1 & 2 with EN SUITE BATHROOMS - With CONVERTED GARAGE to GYM SPACE - Falling within Glebe Farm School Catchment, RATED (cont.)
We are delighted to present this beautifully maintained, three-bedroom home, ideally situated in a peaceful cul-de-sac in the sought-after Eaton Leys development. Perfect for first-time buyers, commuters, or a growing family, this property is vacant and ready for its new owners. The acco...
A RARE OPPORTUNITY TO PURCHASE A SUBSTANTIAL DUAL FAMILY RESIDENCE PRESENTED IN SUPERB “SHOW HOUSE” CONDITION WITH GREAT ATTENTION TO DETAIL, ALL SET IN APPROX. 0.6 ACRE. With living space of 5,061 sq ft the combination of the main house and the purpose-built annex offer gr...
Rarely Available Detached Home on The Mount. Set on a private road within the desirable location of The Mount, this rarely available three bedroom detached house, built circa 1960s, offers approximately 1,800 sqft. of accommodation. Positioned on a generous plot with an enviable rear g
This three bedroom semi detached home is ready to move straight into and offers the perfect blend of modern comfort and convenience. Ideal for families or professionals, the property is neutrally decorated throughout, providing a blank canvas for you to personalise and make your own.
This well-presented detached home on Henry Hoare Drive, MK17 8BZ, offers comfortable and practical living in a sought-after part of Milton Keynes. Set in a quiet, modern development, the property includes a garage and a private driveway with space for two cars. Inside, the house opens with a welc...