The building is of steel portal frame construction with brick/blockwork elevations to approximately 2 metres, with metal profile cladding beneath a pitched single-skin metal clad roof. We understand that works of repair to the roof have been carried out in the last 24 months.
Internally, the warehouse benefits from gas-fired heating, while the office accommodation is fitted with air conditioning. There is lighting throughout which is a mix of fluorescent tube and box fittings. A mezzanine floor provides additional storage accommodation within the warehouse, and the property also benefits from approximately six demised car parking spaces externally.
The tenant currently uses the unit for storage and a workshop purposes.