The property comprises a detached industrial building of steel portal frame construction on a self contained site.
Construction of the subject property was completed in January 2025. Given the eaves height, the client is happy to facilitate the installation of a first floor mezzanine, subject to contract.
The unit benefits from 3 phase electricty. Any lighting must be completed under the proposed tenant fit-out works. The unit also benefits from three automatic roller shutter door to the front elevation, with additonal pedestrian access points at the front and side elevation.
There is a large hardcore compound located adjacent to the subject property; all of which is bound by palisade fencing, with a gated access point.