* Modern units built in 3 phases
* Phases 1 & 2 comprise steel portal framed industrial buildings
* Constructed in 2005 and 2010 respectively
* Phases 1 & 2 connected
* Phase 3 comprises a detached steel portal framed warehouse building constructed in 2023
* Each phase also incorporates integrated office space
* Self-contained securely fenced/gated site
* 4.5 to 6 M clear working height
* Offices to phase 1 with dedicated parking
* Phase 3 includes a production office and WC facilities so could be let/sold separately (subject to negotiation)
* Extensive power supply (Phase 1 400KVA, Phase 2 800 KVA) & solar PV array providing significant power supply to suit manufacturing/production as well as warehouse/added value uses
* A (25) rated EPC
* Purpose built additional first floor storage/production level designed for loading of 1 tonne per m
* Can split to provide 9,548 sq ft or 22,784 sq ft