Units 2 & 3 are two inter-connected units constructed with solid walls, concrete floor, steel truss roof and supporting steel stations within the warehouse. Loading is provided by way of 3 electric roller shutter doors. The warehouse area is constructed to provide a covered single span area that runs the length of the building providing vehicle access along the side of the warehouse and therefore facilitating access to the rear bay and loading / unloading to the front warehouse. This area is separate from the warehouse area by a solid brick wall with access points provided along the length of the dividing wall.
Within the front warehouse, is a raised office area constructed on a steel mezzanine to provide either a storage area or previously used as warehouse / production offices. The front warehouse is fitted with LED lighting and the rear bay is provided with a mixture of roof lights and strip lighting.
To the front of the property is inter-connected single storey office accommodation, configured to provide a mixture of open plan and some cellular offices. The offices are constructed with solid floor and a carpet tile floor covering, suspended ceiling, recessed LED lighting and provides air conditioning units recessed in the ceiling.