The property comprises a mid terrace industrial unit of steel portal frame construction clad with half brick and half metal sheet cladding. The property incorporates offices to the first floor, with kitchen, W/C facilities and warehouse space housed on the ground floor.
The warehouse benefits from 6 m eaves, a full height loading door offering access to the warehouse, along with a separate personnel entrance to the side of the loading door. The loading door is serviced form a loading apron leading into a shared courtyard with car-parking available in-front of the premises.