Detached Houses For Sale in Dorset
Situated in Charlton Down this three/four bedroom house offers a living room which is currently being used as a bedroom, kitchen/dining room, lounge, cloakroom, three bedrooms and a family bathroom. The property benefits from low maintenance garden, single garage and off road parking.
Key features
- 3,822 sq ft / 355.1 sq m of accommodation
- Five spacious bedrooms
- Exceptional Poole Harbour views
With direct water access, this is a once-in-a-lifetime opportunity to acquire a five-bedroom, three-bathroom detached character home in Lilliput, commanding panoramic views of Poole Harbour and the Blue Lagoon. With private water access, a versatile studio, landscaped grounds and accommodation...
Key features
- Landmark waterfront residence in one of Poole Harbour's most prestigious addresses
- Breathtaking panoramic water views across Poole Harbour and the Blue Lagoon
- Private jetty and mooring, offering direct access to the harbour
Inspired by the Latin word for gold, Aurum lives up to its name, presenting an opportunity to create an exclusive and valuable living experience to elevate your lifestyle in an unparalleled way. Every detail is crafted to perfection, meticulously curated to highlight the beautiful architecture.
Key features
- Approved plans for a striking contemporary four-bedroom residence
- The approved design features; Dramatic double-height entrance atrium
- Contemporary architectural design
Key features
- Bespoke collaboration with award-winning Artura Homes
- Significant SDLT savings via serviced plot contract
- 3,900 sq. ft. of luxury over three floors
** VIDEO & INTERACTIVE 3D TOUR ** Set in wonderful SUNNY GROUNDS & little over 0.5 miles from the beach. This impressive & attractive house extends to just over 4,600 SQ FT & boast 5 BEDS, 4 BATHS, choice of receps, stunning CONTEMPORARY KITCHEN plus TRIPLE GARAGE with studio above. Great lifesty...
Key features
- Beaches little over 0.5 miles
- Wonderful manicured grounds
- Circa 4,600 square feet
Key features
- Three luxurious double bedroom suites
- Private indoor swimming pool complex with gym and changing facilities
- Impressive kitchen/breakfast room with adjoining family/dining area
Key features
- Premier Canford Cliffs Village location
- Over 3,700 sq ft of living accommodation
- 4 double bedrooms, 3 bathrooms
Key features
- Developed by the award-winning Bracken Group approximately 10 years ago
- Circa 4600 sq ft of accommodation built to an extremely high specification
- Located in the popular conservation area of Evening Hill, just a short distance of Poole Harbour and Sandbanks award winning beaches
Key features
- Prime Lilliput location on quiet residential road
- Generous 0.22-acre sunny plot
- Approx. 4,716 sq ft across three floors
Key features
- LOCK UP AND LEAVE
- QUIET LOCATION
- CLOSE TO VILLAGE AND BEACH
An outstanding example of a contemporary village house with a state-of-the-art interior, standing in grounds of about 1.5 acres, in the sought after, historic village of Witchampton, in a designated area of outstanding natural beauty, with a private, gated access from the B3078.
Key features
- Innovative, versatile and imaginatively designed accommodation
- Extremely spacious and well appointed throughout
- Magnificent conservatory
Key features
- Edge of sought after village
- Stunning Piddle Valley
- Elegant Grade II listed country house
A rare opportunity to acquire an exceptional waterside residence, enjoying direct water access and far-reaching views across Mudeford Quay, Stanpit Nature Reserve and towards Hengistbury Head. This unique home combines a charming two-bedroom cottage to the front with a striking, architecturall...
Key features
- Exceptional Waterside Residence
- Direct Water Access
- Far-Reaching Views Across Mudeford Quay
An outstanding and exceptionally private coastal home with about 4000 sq ft of luxury living space, carefully designed to make the most of the incredible views over Christchurch Harbour and with stunning gardens leading down to the water's edge. Set back from the road in this most discre...
Key features
- Breath-taking coastal views over Christchurch Harbour with direct water access from the bottom of the garden
- Amazing living space with twin balconies and incredible views towards Hengistbury Head
- South facing gardens with a wonderful summer house perched right on the water's edge
An extraordinary coastal home of about 4800 sq qt, offering the very best in luxury living and located in the area's most sought after, private road within sight and sound of the blue-flag Avon Beach. Situated on the south side of the road with glorious south facing gardens that lead to the rear ...
Key features
- Incredible detached home with striking elevations, set over three floors with luxurious fittings and spacious rooms all flooded with natural light
- Five bedroom suites, all with dressing rooms and designer en-suite facilities (potential for one to be converted into bed/sitting room/annexe)
- First floor balcony with south facing aspect and gorgeous views of the gardens, Christchurch Bay and the Isle of Wight
Key features
- Main house accommodation extends over 4500 sqft
- Multi generational living
- Master bedroom with split room, balcony and ensuite with nearby dressing room
Key features
- Secluded setting down a private driveway
- Gorgeous landscaped grounds offering complete privacy
- Characterful home with potential to extend and update STPP
Key features
- Imposing Victorian country house
- Substantial six-bedroom accommodation extending to approx. 5,145 sq ft
- Mature, parkland style grounds approaching 4 acres
Key features
- Substantial detached family home extending to over 4,100 sq ft including annexe and garage
- Prestigious corner plot position within one of Branksome Park’s most private roads
- Built by respected luxury housebuilder Kingsbury Homes
Positioned directly on the banks of the River Avon, this extraordinary home enjoys one of the most unique and desirable locations within the highly exclusive Avon Castle estate. Properties with direct river frontage here are exceptionally rare, and this remarkable residence — cherished by t...
Set in an extensive 0.72 acre plot this attractive detached home would be perfect for a family upsizing or relocating to the area. With a well presented, flexible layout including five reception rooms and five bedrooms and the garden is a real feature with beautiful landscaping, large lawns and a...
Key features
- Beautifully presented throughout
- Designer kitchen with integral dining area
- Well-proportioned and flexible layout offering over 5,000 sq ft of accommodation
** UPCOMING KLF DEVELOPMENTS PROJECT ** This is an opportunity to get involved at the early stages of the latest development by renowned KLF Developments. FANTASTIC LOCATION just moments from POOLE HARBOUR and CANFORD CLIFFS VILLAGE ! Extends to circa 3,600 SQ FT inc. FOUR beds and FOUR baths!
Key features
- Upcoming KLF Developments project
- Extremely sought after location
- Stunning traditional design with contemporary twist


















































