Properties For Sale in MK17
SAVE £18,400 ON YOUR MOVE*. *PLOT 162 - THE WILBYE AT WOBURN DOWNS*.The Wilbye is an ideal family home, designed with plenty of space for modern living. The ground floor has a dual-aspect lounge and open-plan kitchen with dining area and French doors leading to the garden. On the first floor are ...
A period three bedroom detached property with enclosed front and rear gardens, driveway parking and a detached double garage, situated in a village location. The property retains character features throughout including exposed beams, latch and brace doors and lattice windows. There is approximate...
Originally a farm workers cottage, significantly extended in early 1980s, a four bedroom detached house with a double garage, driveway parking, and an approximately 1 acre rear garden with views over open countryside. Situated in the hamlet of Tingrith, Willow Tree Cottage was formerly a farm cot...
THREE BEDROOM SEMI DETACHED TOWN HOUSE IN SOUGHT AFTER AREA. Connells are delighted to offer this well maintained three bed semi-detached town house property situated in the popular area of Eagle Farm South. Sitting within close proximity to local shops, schools and other amenities.
***Rarely Available - Desirable Village Location - Extended - Four Double Bedrooms - En Suite Bathroom - Spacious Refitted Kitchen - Superb Rear Garden - MUST BE SEEN*** Located in the heart of the desirable village of Bow Brickhill, this stunning detached home offers spacious living a...
AN IMPRESSIVE FIRST FLOOR TWO BEDROOM APARTMENT SET IN MATURE WOODED GROUNDS OF ABOUT THREE ACRES. THE PROPERTY A superb two bedroom first floor apartment set in landscaped grounds on the edge of the Duke of Bedford’s woodlands. Originally built in the late 1880s Daneswood w...
Nestled in the highly sought-after Buckinghamshire village of Stoke Hammond, this beautifully refurbished 4 bedroom detached family home offers the perfect blend of luxury, functionality, and village charm. Situated in a quiet modern cul-de-sac on Brook Farm Close, this exceptional pro...
MUST BE SEEN! ONE WORD **WOW** YES IT'S REALLY THAT GOOD! WOBURN SANDS LIVING & LIFESTYLE! AN ABUNDANCE OF CHARACTER CHARM! BEAUTIFULLY PRESENTED LARGE SIZE PRIVATE REAR GARDEN! THE LIST GOES ON & ON... Offered for sale is this beautifully presented two bedroom semi detached Victorian home locat...
Fabulous four-bedroom end of terrace property located within a semi-rural aspect of Wavendon. Enjoying open aspect views both to the front and rear of the property, and a garden in excess of 100ft, the lovely family home is inviting and spacious. Not just a house, a home with outstanding potential!
A Victorian two bedroom semi-detached cottage with an enclosed rear garden, a tandem garage and off street parking located in the village of Stoke Hammond. Dating back to 1880, the property has accommodation of approximately 936 sq. ft. set over two floors. On the ground floor, access to the prop...
Sought-After Woburn Sands Location | Immaculate Three-Storey Home | Built in 2019 | Spacious Master Suite With En Suite & Built-In Wardrobes | Detached Garage & Driveway For Two Vehicles | Generous Living Room Opening To Garden | Close To Amenities, Excellent Schools & Transport Links...
Move in for Summer at Wavendon Green. The Laleham is located on a corner plot with single garage & driveway parking. A spacious 4-bedroom detached home (1613 sqft) with the potential for future adaptation Now with STAMP DUTY CONTRIBUTION, UPGRADED KITCHEN W...
Welcome to Fourpenny, an enchanting detached cottage positioned in the heart of Mursley with four bedrooms, three reception rooms, three bathrooms including the rare find of a self-contained annexe ideal for growing children wanting independence, ‘granny/grandad flat’ for multi-generational livin...
The Cambridge is an instantly impressive family home from Redrow. Energy efficiency is provided through the use of an air source heat pump, with other exceptional features including private parking, underfloor heating and ultrafast broadband. Three bedrooms, Study and the family bathroom all off...
A very well presented semi detached home situated in a cul de sac location in the sought after village of Drayton Parslow. Drayton Parslow lies to the south of Milton Keynes and is well served by the A421 and A4146 with Bletchley Station just a short drive away.
A modern four bedroom detached house with a southerly facing rear garden, an integral garage and driveway parking, situated in a cul-de-sac. The property has been extended by the current owners and now has approximately 1,498 sq. ft. of accommodation which includes an entrance hall which has stai...
A modern three bedroom semi detached house with a garage, driveway parking and L-shaped rear garden. This property has 796 sq. ft. accommodation which includes on the ground floor an entrance hall, a sitting room and a kitchen/dining room. On the first floor the principal bedroom has...
MUST BE SEEN! FOUR BEDROOM DETACHED FAMILY HOME! SOUGHT AFTER QUIET TUCKED AWAY LOCATION & SCHOOLING AREA! WELL PROPORTIONED ROOMS! LARGE SIZE OPEN KITCHEN/DINING/FAMILY ROOM! TWO EN-SUITES, BEAUTIFUL LANDSCAPED REAR GARDEN WITH BRICK WALL SURROUND! GARAGE & PARKING! THE LIST GOES ON & ON... Off...