Properties For Sale in Aspley Heath, Milton Keynes, Buckinghamshire
NO ONWARD CHAIN | MUST BE SEEN Situated in a sought-after and peaceful position within this popular over-55s development, this beautifully refurbished one-bedroom, first-floor apartment is ideally located within walking distance of Woburn Sands High Street, offering convenient access to local s...
A five bedroom detached bay fronted house with driveway parking, an established rear garden with a home office, and an integral garage situated on the edge of the Woburn Estate in Aspley Heath. With original parts over 150 years old and later additions, this double fronted brick under slate prope...
Key features
- Period detached house
- Five bedrooms; two en suite
- Four reception areas
A Victorian extended five bedroom detached cottage situated at the top of Aspley Heath woods adjacent to Duke of Bedford woodland The property has a wealth of local history and forms part of the original village of Hogsty End. There is 2,530 sq. ft, of accommodation over two floors. The ground fl...
Key features
- Victorian detached cottage
- Five bedrooms
- En suite shower room and family bathroom
A contemporary split level five bedroom detached house including a self-contained one bedroom annexe - if required - off street parking, a garage, and a westerly facing garden, 5 minutes’ walk from Woburn Sands High Street. The property has 2,686 sq. ft. of accommodation over two main floo...
Key features
- Contemporary split level detached house
- Five bedrooms; four bath/shower rooms
- Sitting room opening to a wraparound deck
An idyllic three bedroom semi detached Edwardian cottage situated in the sought after conservation area of Aspley Heath and dating back to 1910. The property provides such charm, with features to include, latched timber latched doors, quarry tiling and the first floor with vaulted ceilings.
Key features
- Large garden office ideal for hybrid working with easy access to the M1 and rail links
- Excellent potential to create a four-bedroom family home and extend into the garage (STPP)
- Perfect for outdoor lifestyles with dog walks and mountain biking in nearby Aspley Woods
An Edwardian four bedroom semi-detached house with two garages, parking, and gardens with far reaching countryside views from the rear situated on the edge of the Woburn Estate in Aspley Heath. Built in 1904, this bay fronted property has approximately 1,618 sq. ft. of accommodation arranged over...
Key features
- Edwardian semi-detached house
- Four bedrooms, family bathroom
- Two reception rooms
A SPACIOUS GROUND FLOOR APARTMENT SITUATED IN A LOVELY WOODED SETTING AND WITHIN COMMUNAL GROUNDS OF ABOUT 3½ ACRES. THE PROPERTY Entry is via a covered porch through its own front door into the entrance hall with fitted cupboards and an airing cupboard. Off the hallway is...
A fantastically presented two double bedroom, two bathrooms, first floor apartment with large open plan kitchen/dining/living room. The property is set beautiful mature wooded grounds approaching some 3.5 acres, adjacent to Duke of Bedford woodland, having undergone extensive refurbishment.
Impressive three-bedroom duplex apartment, finished to a high specification and ideally located on the sought-after Woburn Sands High Street. Featuring an open-plan living space, a principal bedroom with en suite and private roof terrace, this stylish home offers contemporary living.
Key features
- REFURBISH DUPLEX THREE BEDROOM APARTMENT
- MODERN OPEN PLAN LIVING
- CLOAKROOM
Key features
- STUNNING NEWLY RENOVATED ONE BEDROOM HOME
- MODERN OPEN PLAN LIVING
- PREMIUM KITCHEN WITH BUILT IN APPLIANCES
NO ONWARD CHAIN | MUST BE SEEN Situated in a sought-after and peaceful position within this popular over-55s development, this beautifully refurbished one-bedroom, first-floor apartment is ideally located within walking distance of Woburn Sands High Street, offering convenient access to local s...
Key features
- MUST BE SEEN!
- SOUGHT AFTER LOCATION
- ONE BEDROOM APARTMENT FOR OVER 55'S LIVING
One for the over 55`s! This first floor apartment is ready to move into, decorated in neutral tones throughout and with a refitted kitchen and bathroom. Ideally located within walking distance of Woburn Sands High Street and offering independent living in a secure residential environment.
* A REFITTED, GROUND FLOOR OVER 55'S RESIDENTIAL APARTMENT SITUATED OVER BEAUTIFUL GROUNDS WITHIN THE VILLAGE OF ASPLEY HEATH * Urban & Rural are delighted to be marketing this delightful one double bedroom ground floor apartment within an over 55's independant living ret...
Located in Woburn Sands and with advantageous views of the High Street, this well presented first floor apartment for the over 55`s is a great little private haven offering independent living with all the benefits of a secure community environment. Offered for sale with no upper chain!
One for the over 55`s! This first floor apartment is ready to move into, decorated in neutral tones throughout and with a refitted kitchen and bathroom. Ideally located within walking distance of Woburn Sands High Street and offering independent living in a secure residential environment
SALE AGREED WITHIN 35 DAYS, SELLING IN THIS DEVELOPMENT? PLEASE CALL. This apartment is set within a popular over-55s development, ideal for those looking to enjoy independent living within a friendly community. Offering well-maintained communal gardens with seating areas, providing ple...
Located in Woburn Sands and with advantageous views of the High Street, this well presented first floor apartment for the over 55`s is a great little private haven offering independent living with all the benefits of a secure community environment. Offered for sale with no upper chain!
This one-bedroom, FIRST FLOOR APARTMENT is for RESIDENTS OF OVER 55 YEARS OF AGE, and has a SPACIOUS AND BRIGHT LOUNGE/DINING ROOM and BRIGHT KITCHEN. The complex is conveniently situated WITHIN 500 METERS OF HIGH STREET AMENITIES.****AUCTION NOW LIVE!!****


























