Properties For Sale by Michael Graham, Newport Pagnell, including sold STC
61 results
A Victorian three bedroom end of terrace property with a garage and store, and one allocated parking space, situated within a 2 minute walk of the High Street in Newport Pagnell. The 19th-century brick under slate property has approximately 1,116 sq. ft. of accommodation arranged over two floors ...
A six bedroom property in a Grade II listed Tudor mansion, with a gym, stables, a garage, parking, and private gardens in the grounds of Crawley Grange, North Crawley. Crawley Grange was built in 1526 for Cardinal Wolsey and Queen Elizabeth I visited in 1575. It features in Pevsner’s Buildi...
A brand new five bedroom barn conversion with three en suites, a double garage and parking, and 3.5 acres available to rent under separate negotiation, situated with surrounding countryside views. The barn has been converted with high quality fixtures and fittings including underfloor zone heatin...
A stone built four bedroom barn conversion with a two bedroom annexe, a triple garage and games room, and extensive courtyard parking, situated on the edge of Hanslope with open countryside views. The converted property retains many period features such as exposed stone walls, and timber beams, c...
An individually designed red brick four/five bedroom detached house with four bath or shower rooms, and off street parking for five cars, backing on to park and river walks in the market town of Newport Pagnell. The owners have completed a full refurbishment, and added a utility room and a glass ...
A contemporary five bedroom detached property with a refitted en suite shower room and bathroom, an electric gated driveway with a double garage and off street parking, situated on a corner plot in Giffard Park. The property has been reconfigured and upgraded by the current owner to include a ref...
An extended five bedroom detached property with a downstairs bedroom and en suite, a garage and extensive off street parking, situated on a corner plot overlooking the pond on Marsh Drive in Great Linford. The property has over 2,780 sq. ft. of versatile accommodation including a dual aspect sitt...
A stone built five bedroom detached property with four reception rooms, two en suites, and a detached double garage, situated in the village of Hartwell. The property has approximately 2,980 sq. ft. of accommodation which includes a dual aspect sitting room at the rear with a feature brick firepl...
An individual four double bedroom self-built detached property with two en suite bedrooms, a detached double garage, off street parking, and a mature rear garden, situated on a 0.4 acres plot in the village of Cranfield. The accommodation includes a hall with a feature staircase to the first floo...
A contemporary individually built four double bedroom detached property with a downstairs bedroom, three bathrooms, extensive off street parking, and gardens, situated on the edge of Cranfield village backing onto farmland with open views. This brick and render under tile property has approximate...
An individually designed four bedroom detached property with a ground floor principal bedroom and wet room, a double garage, off street parking and wrap around gardens, on a quiet no through lane in Great Linford. The accommodation has tiled flooring with underfloor heating throughout the ground ...
A unique four bedroom detached property with a principal en suite and dressing room, an over 21 ft. by 16 ft. 4 garage, an in and out driveway, and mature gardens, situated in the village of Hartwell. The accommodation includes a dual aspect sitting room with a feature log burner, parquet floorin...
A contemporary five bedroom detached house with two en suite shower rooms, an orangery, a double garage and parking, situated in the village of Astwood. The accommodation includes a sitting room with a feature exposed brick fireplace with an inset log burner. There are doors to the Orangery which...
A stone built 2,821 sq. ft., five double bedroom detached house with three en suites, a studio annexe and a double garage, situated with views of the church in Hanslope village. Character features throughout include exposed timbers and stone work, bespoke oak doors, inglenook fireplaces and wroug...
An individually built and extended four bedroom detached property with detached double garage, situated in a quiet cul-de-sac in the centre of North Crawley village. The accommodation includes an 18' x 17' sitting room overlooking the front garden with a feature open fireplace, leading ...
A Grade II listed 17th century, part thatched cottage with a self-contained annexe, a triple garage, and extensive off street parking, situated on approximately a 0.24 acres plot in the village of Moulsoe. The accommodation includes an entrance with a hardwood stable door and terracotta tiles wit...
A four double bedroom detached house with a double garage and extensive parking, backing onto fields in the village of Hanlope. The accommodation includes a dual aspect sitting/dining room with a feature fireplace, and two sets of bi-fold doors to the garden , and a study. Also on the ground flo...
A contemporary five bedroom detached property with four bath or shower rooms, a double garage and off street parking for three cars, situated in a cul-de-sac in the village of Hanslope. The 2,167 sq. ft., of accommodation is set over three floors and includes an entrance hall with a cloakroom, do...
A contemporary five bedroom detached property with three en suite shower rooms, a double garage, off street parking, and no upper chain, situated in the village of Hanslope. The accommodation is set over three floors and has been recently re-decorated throughout. It includes an entrance hall with...
A period stone under slate four/five bedroom detached property with four reception rooms, wraparound gardens, and parking for up to four cars set in a village location. The property has approaching 2,600 sq. ft. of accommodation set over two floors. On the ground floor an entrance hall has built-...
A modern five bedroom detached property with two en suite shower rooms, three reception rooms, and off street parking, situated in the village of Cranfield. The accommodation includes an entrance hall with a built-in storage cupboard, stairs to the first floor with an understairs storage cupboard...
A contemporary four bedroom detached property with an en suite shower room, a garage converted to an office/gym, with off street parking and an enclosed rear garden, situated on a corner plot overlooking Marston Vale, in Cranfield village. The property has been extended and improved since new by ...
A 1930s three bedroom detached property in need of total modernisation, situated on a 0.3 acres plot at the end of a cul-de-sac, in the market town of Newport Pagnell. The property is a renovation project and has the potential for side and rear extensions, subject to gaining the relevant planning...
A contemporary four bedroom detached house with an en suite shower room, a double garage, and extensive gated parking, situated in the village of Cranfield. The property has an air source heat pump which was fitted in 2025, and solar panels which help reduce electricity bills and generate an inco...
A brand new four bedroom three storey semi detached house with an en suite and dressing room, off street parking, situated backing on to the Grand Union Canal just off the Wolverton Road. The ground floor accommodation includes an entrance hall with stairs to first floor, a sitting room, a cloakr...





























