The property comprises a single-storey, clear span, steel portal frame industrial building, constructed in 2015, with internally constructed two storey offices, staff and stores to part.
· Reinforced concrete floor to a minimum weight load of 45 km/m2
· Eaves height 8.8m to underside of haunch.
· 2 No ground level loading doors
· Internal comfort cooled offices over 2 No floors
· Substantial first floor workshop and stores
· Secure Yard
· Generous parking
All main services are connected to the property, including 3 phase power, gas, water and drainage.
No test has been made of the services. The incoming tenant or buyer must satisfy themselves in connection with them and the facilities.