Warehouses To Let in North Londonshire, Northamptonshire
Paid partnerships can play a role in listing order
The premises comprise a detached portal frame construction with a power floated concrete floor with part cavity brick/block walls to low level with the remaining walls being insulated profile steel cladding and to the roof with the roof incorporating double skin translucent roof lights. Loading is from the rear elevation via two up and over loading doors with a further detached single skin warehouse area situated within the secure yard. The building has two-storey offices to the front elevation accessed via a main reception area leading to ground floor offices, wc's and canteen area on the ground floor and stairs leading to the first floor offices that also incorporate male and female wc's, kitchen area and to a fully glazed boardroom. Warehouse is currently fully racked out having approximately 3,100 pallet spaces with mezzanine floor in part fitted with gas fired radiator heating to the offices with some air conditioning / comfort cooling heating system to parts with offices largely to a high specification including dado trunking, suspended ceilings, LED lighting and high quality floor surfaces. Externally the property is accessed directly off Henson Way with car parking to the front for 13 cars with access road leading to the side of the unit into the rear main yard area largely concreted with a small area hard surfaced and the yard area is gated with a secure Palisade fence.
- 4 Level Access Doors
- 5.4m Height to Haunch & 6.4 - 7.4m Height to Apex
- PV Panels Solar
For let is the cold store/chiller warehouse of a former yoghurt manufacturing unit. Within a secure site and with excellent access to A14 (5 miles away), the unit provides c.20,000 sf of operational chilled space, partially racked (for 945 euro pallets) and with 8m high ceilings throughout.
- c.20,000 sf cold store
- 1x Dock loading door
- Partially racked
The property is a mid terrace light industrial/warehouse unit of portal steel frame construction. The front elevation is of brick cladding to approximately 1m high with insulated steel cladding above. The roof is clad with insulated steel sheeting incorporating translucent roof lights. Loading access to the property is via 1 No electric up and over type loading door approximately 4.5m wide x 4.4m high. Pedestrian access is via a glazed door to the side. Internally the property has ground floor office space of block work construction with carpeted floors, plastered and painted walls, wall mounted trunking. The property also has first floor mezzanine/storage which sits above the offices and is accessed via an internal staircase from the warehouse. The property has shared yard space to the front and 5 car parking spaces.
Unit 4 Shieling Court is a modern semi detached industrial / warehouse unit of steel portal frame construction. It has a pitched metal clad roof with 10% rooflights. Elevations are of cavity facing brick / block construction surmounted by steel cladding parapet. There are powder coated aluminium doors and windows with sealed unit double glazing. To the rear is a sectional loading door with adjacent fire exit. Internally the unit is fitted with two storey office accommodation to the front comprising a mix of open plan and cellular offices together with entrance lobby incorporating male and female WC's. The offices benefit from suspended ceilings, air conditioning, lighting, carpeting and security grills to ground floor windows. The warehouse area has a concrete floor, three phase electrics, ceiling mounted powrmatic gas blower heater and strip lighting together with loading door. The unit is also fitted with a good quality boarded mezzanine offering further storage. The warehouse area has a height of 2.7m to the underside of the mezzanine.
Unit 3 Shieling Court is a modern semi detached industrial / warehouse unit of steel portal frame construction. It has a pitched metal clad roof with 10% rooflights. Elevations are of cavity facing brick / block construction surmounted by steel cladding parapet. There are powder coated aluminium doors and windows with sealed unit double glazing. To the rear is a sectional loading door with adjacent fire exit. Internally the unit is fitted with two storey office accommodation to the front comprising a mix of open plan and cellular offices together with entrance lobby incorporating male and female WC's and kitchenette. The offices benefit from suspended ceilings, air conditioning, lighting, carpeting and security grills to ground floor windows. The warehouse area has a concrete floor, three phase electrics, ceiling mounted powrmatic gas blower heater and strip lighting together with loading door. The unit is also fitted with a good quality boarded mezzanine offering further storage. The warehouse area has a height of 2.7m to the underside of the mezzanine.
The subject property is part of a 13 unit courtyard development, fronting on a central courtyard area. Terrace of steel portal frame constructed buildings under pitched roofs with translucent roof panels Loading doors for each unit Minimum eaves height of 3.5 m, with 6.5 m to apex Each unit has welfare facilities, including WCs Well proportioned parking and loading access for each unit
The subject property is part of a 13 unit courtyard development, fronting on a central courtyard area. Terrace of steel portal frame constructed buildings under pitched roofs with translucent roof panels Loading doors for each unit Minimum eaves height of 3.5 m, with 6.5 m to apex Each unit has welfare facilities, including WCs Well proportioned parking and loading access for each unit
The Hermitage Works is currently under construction for an attractive high quality development located on a strategic position between Market Harborough and Desborough where planning consent has been granted for a light industrial scheme to accommodate buildings constructed around a portal frame with a mixture of cavity wall brickwork and cladded elevations beneath an insulated clad roof. The units will be of a terrace design and can be tailored to meet occupiers specific requirements at this stage. The sizes can range from 1,788 sq.ft. up to circa 22,000 sq.ft. in total for the whole scheme. Specification includes three phase electrics, insulated solid concrete floors, internal clearance to eaves of 5m, LED lighting, fibre optic connection, electrically operated roller shutter doors and allocated parking and loading facilities. Practical Completion due Q2 2025.
The Hermitage Works is currently under construction for an attractive high quality development located on a strategic position between Market Harborough and Desborough where planning consent has been granted for a light industrial scheme to accommodate buildings constructed around a portal frame with a mixture of cavity wall brickwork and cladded elevations beneath an insulated clad roof. The units will be of a terrace design and can be tailored to meet occupiers specific requirements at this stage. The sizes can range from 1,788 sq.ft. up to circa 22,000 sq.ft. in total for the whole scheme. Specification includes three phase electrics, insulated solid concrete floors, internal clearance to eaves of 5m, LED lighting, fibre optic connection, electrically operated roller shutter doors and allocated parking and loading facilities. Practical Completion due Q2 2025.
The property is a mid-terrace light industrial / warehouse unit of steel portal frame construction. The front elevation has low level cavity brick / block walls to approximately 1m high with insulated steel profile cladding above and to the roof, with the roof incorporating double skin translucent roof lights. Access to the unit is via double glazed, aluminium framed double doors into the office area and with an up and over insulated loading door approximately 4.5m wide x 4.5m high. Internally the property is fitted with ground floor reception / offices, male and female / disabled WCs and has air conditioning units fitted. The main open warehouse area has a full eaves height of approximately 7.65m and fitted with a suspended gas blower heater. Above the office block is a fully boarded mezzanine floor suitable for light storage with staircase access and also a forklift safety loading gate. Externally in the yard area is a large circulation space for access for HGV's and there are 6 dedicated car parking spaces with the building.
The property comprises a mid terrace industrial unit accessed via roller shutter door and personnel entrance. The unit is mainly open plan space with office, reception, and male and female w.c's. A mezzanine floor has been installed providing additional storage over the offices.
The Hermitage Works is currently under construction for an attractive high quality development located on a strategic position between Market Harborough and Desborough where planning consent has been granted for a light industrial scheme to accommodate buildings constructed around a portal frame with a mixture of cavity wall brickwork and cladded elevations beneath an insulated clad roof. The units will be of a terrace design and can be tailored to meet occupiers specific requirements at this stage. The sizes can range from 1,788 sq.ft. up to circa 22,000 sq.ft. in total for the whole scheme. Specification includes three phase electrics, insulated solid concrete floors, internal clearance to eaves of 5m, LED lighting, fibre optic connection, electrically operated roller shutter doors and allocated parking and loading facilities. Practical Completion due Q2 2025.
The property comprises of a distinctive two storey steel framed unit with cladding and a yellow trim. The front door leads into a lobby area with door through to the ground floor and stairs rising to the first floor. The ground floor has a painted concrete floor, flourescent strip lighting, gas fired radiators and double glazed windows to the front elevation. There are double doors for loading/unloading to the side elevation. Also located on ground floor are two WC's and a kitchenette. The first floor is fitted with new carpets, suspended ceilings, cat 2 lighting and gas fired radiators. The accommodation is mainly open plan with a large partitioned office to one side.
The Hermitage Works is currently under construction for an attractive high quality development located on a strategic position between Market Harborough and Desborough where planning consent has been granted for a light industrial scheme to accommodate buildings constructed around a portal frame with a mixture of cavity wall brickwork and cladded elevations beneath an insulated clad roof. The units will be of a terrace design and can be tailored to meet occupiers specific requirements at this stage. The sizes can range from 1,788 sq.ft. up to circa 22,000 sq.ft. in total for the whole scheme. Specification includes three phase electrics, insulated solid concrete floors, internal clearance to eaves of 5m, LED lighting, fibre optic connection, electrically operated roller shutter doors and allocated parking and loading facilities. Practical Completion due Q2 2025.
The Hermitage Works is currently under construction for an attractive high quality development located on a strategic position between Market Harborough and Desborough where planning consent has been granted for a light industrial scheme to accommodate buildings constructed around a portal frame with a mixture of cavity wall brickwork and cladded elevations beneath an insulated clad roof. The units will be of a terrace design and can be tailored to meet occupiers specific requirements at this stage. The sizes can range from 1,788 sq.ft. up to circa 22,000 sq.ft. in total for the whole scheme. Specification includes three phase electrics, insulated solid concrete floors, internal clearance to eaves of 5m, LED lighting, fibre optic connection, electrically operated roller shutter doors and allocated parking and loading facilities. Practical Completion due Q2 2025.


