Detached Houses For Sale in North Barn, Dorchester, Dorset
A rare oppurtunity to purchase a beautifully presented Grade II listed home beneath a thatched roof, nestled in a conservation area within the sought-after village of Frampton. This charming property offers a spacious and versatile accommodation, rich in character set within mature grounds.
An exquisite family home tucked away on the edge of a picturesque and much sought-after village which has been sympathetically upgraded, set in the most delightful gardens and grounds (of approximately 5 acres) with a separate bothy and three bedroomed lodge. THE PROPERTY Tucked ...
Washing Pool House is a Grade II listed Elizabethan former farmhouse set within approximately 0.75 of an acre of land. This substantial property retains many of its original features and has been thoughtfully refurbished to a high standard including the conversion of the barn. This wonderful hom...
Visit our newly launched homes and discover more about life at The Hamlet. Located in Poundbury, the Corfe is a beautifully designed four-bedroom detached home, offering generous living space alongside the timeless architectural character that defines the area.
A beautifully designed four-bedroom home set over three floors, enjoying an enviable position overlooking the Great Field. Offering elegant, light-filled accommodation, two balconies, a landscaped garden, double garage and parking, this is a stylish and well-balanced home in one of Poundbury&r...
A detached handsome edwardian family home, standing in an elevated position with views over the River Frome water meadows. The property is an impressive and well-built Edwardian house dated from 1904. The house was commissioned by Alfred Pope, from the local brewing family who still own the Wrac...
Accessed via a bridleway, copyhold lane, this impressive, detached family home is situated in a designated conservation area and within an area of outstanding natural beauty. The home boasts versatile and spacious accommodation comprising three reception rooms, a modern kitchen/dining room with s...
Simply stunning property, boasting over 3000 sq ft, set in the sought after location of Poundbury, with spectacular views over Maiden Castle and Crown Square and with the added benefit of a separate double garage with a large studio and shower room above for versatile use. Viewing is an absolute ...
A beautifully proportioned four double bedroom Georgian-style home with south-east facing walled garden, double garage and distinctive vaulted carport, ideally positioned moments from Pavilion Green in the heart of Poundbury’s vibrant and well-connected community.
A stunning example of Poundbury luxury, this four double bedroom imposing family residence enjoys picturesque, sweeping countryside views and is presented to an exceptional standard throughout. Stepping inside, you are welcomed by a grand entrance hallway that immediately sets the tone f...
A honey-coloured brick, 4 bedroom detached home with double garage. This new home, currently under construction, features a distinctive exterior with elegant porch detailing and a symmetrical design. Generous windows flood the interior with natural light and offer views over the Dorset countryside.
A highly desirable, detached four-bedroom property offering an exceptional standard of living in the sought-after area of Poundbury. Found in an area of outstanding natural beauty, this double fronted home has a wealth of light and spacious, beautifully presented accommodation. The home comprises...
Charming FOUR/ FIVE BEDROOM Grade 2 Listed property with THREE RECEPTION ROOMS, INGLENOOK FIREPLACES and CHARACTER FEATURES. SOUTHERLY GARDEN with countryside views, GARDEN ROOM, GARAGE WORKSHOP with OFFICE, SOLAR PANELS and GENEROUS PARKING































