Properties For Sale in Sheeplane, Milton Keynes, Buckinghamshire
READY TO MOVE IN, this fantastic new-build home benefits from flooring and blinds included, an integrated double garage, driveway parking and an EV charger. Reduce your energy bills by up to 27% on new build homes* CHRISTMAS OPEN DAY - SATURDAY 7TH NOVEMBER
AN EXTREMELY IMPRESSIVE SIX BEDROOM DETACHED PERIOD PROPERTY OFFERING SUBSTANTIAL LIVING ACCOMMODATION ENJOYING AN ABUNDANCE OF CHARACTER AND CHARM. THE PROPERTY Church Farm is a beautifully presented Grade II detached property enjoying a slightly elevated position and set in deli...
Key features
- OVER 3,900 SQUARE FEET OF ACCOMMODATION
- GRAND ENTRANCE HALL
- FOUR RECEPTION ROOMS
Offering nearly 4500 square feet of living space this exquisite family home has period charm with original parts dating back to 1670 mixed with modern luxury. This immaculately presented grand family home enjoying a 0.25 acre plot is offered for sale for the second time in nearly a century. Elega...
Key features
- A rarely available beautifully presented five bedroom detached family home in a prestigious location.
- Gorgeous curb appeal with large driveway, and mature front gardens.
- Four spacious reception rooms downstairs, perfect living space for the family home.
AN IMPOSING DETACHED FARMHOUSE WITH A 13M x 5M STUDIO BARN AND GROUNDS OF ONE ACRE, SET IN A VILLAGE LOCATION WITH EXCELLENT COMMUTER LINKS. Moat Farm is a substantial Grade II Listed farmhouse which enjoys a pleasant edge of village location and is within easy reach of Leighton Buzzar...
A SUBSTANTIAL DETACHED PROPERTY BUILT IN 1901 AND OCCUPYING A SUPERB PLOT OF NEARLY HALF ACRE ON THE VILLAGE BORDERS AND ENJOYING STUNNING VIEWS TO THE REAR. THE PROPERTY Wayside House is a beautifully presented period property offering spacious and flexible accommodation together...
Key features
- BEAUTIFULLY PRESENTED THROUGHOUT
- APPROACHING HALF AN ACRE PLOT
- SUPERB VIEWS
A Grade II listed part 15th century four bedroom detached house with a self-contained one bedroom studio flat, a double carport, stables, and a mature rear garden. The house is a half-timbered property with parts dating back to the 15th century. It has a 19th century façade of brick with ...
Key features
- Grade II listed part 15th century detached house
- Four bedrooms; one en suite
- Three reception rooms
SET ON A PLOT OF 0.5 ACRE ENJOYING OPEN VIEWS OVER FARMLAND AND THE VILLAGE CHURCH, A DETACHED HOUSE WITH A SUBSTANTIAL RANGE OF TRADITIONAL TIMBER FRAMED AND BRICK BARNS. Set in the conservation area and being the very last house in Church Road, Carisbrooke House enjoys a most pleasan...
We are delighted to offer for sale this exceptional Grade II listed detached cottage, situated along the charming and historic Old School Lane in the heart of Stoke Hammond. Known as Orchard Cottage, this remarkable home dates back to the 16th century and forms part of one of the village’s most c...
Key features
- Stunning 16th Century Grade II Listed Part-Thatched Cottage
- Expansive & Versatile Accommodation
- Secluded Historic Village Location
An immaculately presented modern detached home in a gated lakeside setting, on the outskirts of Bow Brickhill. Approx. 2,000 sq ft with stunning open-plan kitchen/family room, 4 bedrooms (2 en-suite), landscaped garden, parking, garden studio/home office and countryside views. No onward chain.
Key features
- Immaculately presented four bedroom detached family home
- Gated lakeside development
- Offered to the market with no onward chain
MOVE IN NOW! Reduce energy bills by up to 27% on new build homes*. Set in a welcoming community close to good schools, amenities and transport links. LAST FEW REMAINING – DON'T MISS OUT! CHRISTMAS OPEN DAY - SATURDAY 7TH NOVEMBER
We are proud to present White Maples in the highly regarded village of Little Brickhill. A stunning, four bedroom former coaching inn with five reception rooms. If you are looking for a large garden to enjoy, look no further as you have one of the most incredible half acre gardens around. The acc...
Key features
- A beautiful Grade II listed former coaching inn – Approaching 2500 square feet on a plot over half an acre.
- Versatile living accommodation with up to four bedrooms and downstairs bedroom potential.
- Four separate living rooms, a wonderful spacious family home. Library, living room, breakfast room, dining room and an office.
LAST FEW REMAINING – DON'T MISS OUT! MOVE IN NOW WITH STAMP DUTY PAID UP TO £31,250. Set in a welcoming community close to good schools, amenities and transport links. Reduce energy bills by up to 27% on new build homes* CHRISTMAS OPEN DAY - SATURDAY 7TH NOVEMBER
Deakin-White Estate Agents in Wing, Linslade & Leighton Buzzard are pleased to present to the market for sale this exceptional five-bedroom detached family home with outstanding specification Set within an exclusive private close of just six detached homes, this beautifully presented five-bedr...
Key features
- Five Bedroom Detached With Four Bathrooms
- Village Location
- Set Within An Exclusive Private Close
MOVE IN NOW! £20,000 MORTGAGE CONTRIBUTION & FLOORING INCLUDED. Reduce energy bills by up to 27% on new build homes*. Set in a welcoming community close to good schools, amenities and transport links. LAST FEW REMAINING – DON'T MISS OUT! CHRISTMAS OPEN DAY - SATURDAY 7TH NOVEMBER
INCLUDES £20,000 DEPOSIT CONTRIBUTION AND VIEW HOME FURNITURE INCLUDED. Set in a welcoming community close to good schools, amenities and transport links. Reduce energy bills by up to 27% on new build homes* Includes separate living room, study and utility. CHRISTMAS OPEN DAY, SATURDAY 7TH NO...
Key features
- £20,000 DEPOSIT CONTRIBUTION
- FLOORING INCLUDED
- AIR SOURCE HEAT PUMPS
Nestled in a charming village setting and occupying an exceptionally generous plot, this delightful four-bedroom semi-detached character home combines period charm with versatile family living. Backing directly onto open green space, the property enjoys a wonderful sense of privacy and country-st...
Key features
- Charming Four-Bedroom Semi-Detached Character Home
- Desirable Village Location
- Generous Plot Backing Onto Open Green Space
We are proud to offer for sale this beautifully presented five bedroom detached family home approaching 2000 sq feet in a secure gated development within Stoke Hammond in the grammar school catchment area. The property has been extended and finished to a high specification with accommodation incl...
Key features
- An extended detached family home that has been modernised throughout, finished to a good specification.
- Approaching 2000 square feet.
- Five generous bedrooms as well as a useful storage area.
Key features
- FLOORING INCLUDED
- FITTED BLINDS THROUGHOUT
- INTEGRAL DOUBLE GARAGE
READY TO MOVE IN, this fantastic new-build home benefits from flooring and blinds included, an integrated double garage, driveway parking and an EV charger. Reduce your energy bills by up to 27% on new build homes* CHRISTMAS OPEN DAY - SATURDAY 7TH NOVEMBER















































