Properties For Sale in Aspley Guise, Milton Keynes, Buckinghamshire
A rare opportunity to acquire a substantial country property, offering exceptional flexibility to suit a range of purchasers. The property comprises a well-appointed residence with extensive landscaped gardens and the opportunity to purchase additional land to suit your requir
Key features
- Detached thatched country residence
- Surrounded by established formal gardens
- Five bedrooms and four bath/shower rooms
A spacious bungalow with land in a secluded position within the highly desirable village of Aspley Guise, offering versatile and well proportioned accommodation throughout, with great potential for extension or further development (subject to relevant planning permission).
Key features
- 4 Bedroom detached
- Set in grounds of approximately 10 acres
- A high degree of privacy
SET ON A SECLUDED AND GATED PLOT IN ONE OF THE MOST SOUGHT-AFTER PRIVATE ROADS IN ASPLEY GUISE, AN IMMACULATELY PRESENTED FAMILY HOUSE PERFECT FOR MODERN DAY LIVING. A rarely available detached house set in Mentone Avenue, bordering the Duke of Bedford’s woodland with delig...
AN IMPRESSIVE PERIOD PROPERTY LOCATED IN ONE OF THE AREAS PRIME RESIDENTAL ROADS CLOSE TO WOODLANDS AND THE PRESTIGIOUS WOBURN GOLF CLUB. THE PROPERTY Built in 1905 with later additions this substantial family comes onto the market presented to high standard throughout, particular...
Key features
- Cloakroom
- Sitting Room & Family Room
- Garden Room
A unique opportunity to purchase a chocolate box cottage, in a quiet location. Situated on a 'no-through-road', in the ever sought after village of Aspley Guise. With beautiful views over fields to the front, and a 0.64 acre plot surrounded by woodland, offering total tranquility and privacy. An ...
Key features
- Beautiful chocolate box thatched cottage with character features and a modern garden room extension. (Not a listed building)
- Bright garden room with full-height glazing and skylights overlooking the landscaped gardens.
- Spacious kitchen/dining room creating the beating heart of the home.
A SMARTLY PRESENTED 3 STOREY MODERN DETACHED HOUSE ENJOYING AN OPEN ASPECT TO THE REAR. This modern detached house comes on to the market having been well maintained by the present owners close to the local lower school and benefits from an open aspect to the rear. GROUND F...
A modern four bedroom semi-detached bungalow with a front garden alongside driveway parking, a single separate garage and an enclosed rear garden backing onto paddocks in the village of Aspley Guise. This property has 1,260 sq. ft. of versatile accommodation arranged over two floors. On the groun...
Key features
- Modern semi-detached chalet bungalow
- Four bedrooms
- Three bathrooms
This beautifully presented four bedroom detached home has a warm and welcoming feel throughout, with bright and airy rooms that create a lovely sense of space. The property is tucked away along a private cul-de-sac just off Salford Road, in the popular village of Aspley Guise.
Key features
- Four bedroom detached family home
- Positioned within a small private cul-de-sac
- Two reception rooms plus conservatory
M&M Properties are delighted to present this charming detached home in the picturesque Bedfordshire village of Aspley Guise. Beautifully maintained and recently redecorated throughout, it offers an elegant, move-in-ready setting for its next owners. A standout feature is the BRAND NEW RO...
Key features
- Brand new roof - 9 years warranty remaining
- Picturesque village of Aspley Guise
- Stunning original character
A Grade II listed Georgian two bedroom detached cottage with an established rear garden, off street parking and a carport in the centre of the village of Aspley Guise. Traditionally constructed with timber framing, this 17th-century cottage has over 1,400 sq. ft. of accommodation with period feat...
Key features
- Grade II listed Georgian cottage
- Two double bedrooms
- First floor family bathroom
OFFERED WITH NO CHAIN – AN IMPROVED AND EXTENDED THREE BEDROOM HOUSE SET IN THE SOUGHT-AFTER VILLAGE OF ASPLEY GUISE. An ideal growing family home or one to downsize to. This traditional house has been extended to provide a study, sitting room and the much-in-demand combined kit...
A TWO DOUBLE BEDROOM VICTORIAN TERRACED PROPERTY LOCATED IN A PRIME RESIDENTIAL AREA CLOSE TO WOODLANDS. THE PROPERTY This period property enjoys a highly sought after and peaceful location within the popular village of Aspley Guise and is being sold with the benefit of no onward ...
A well presented three bedroom semi detached home in sought-after Aspley Guise, offering a spacious sitting/dining room, fitted kitchen, family bathroom, large rear garden, driveway parking and a garage. An ideal family home in good condition throughout, with the benefit of no onward chain.
Key features
- Three bedroom semi detached house
- Sought-after Aspley Guise location
- Good condition throughout
A mid-20th century three bedroom semi- detached cottage with front and rear gardens in a village location. This property has 904 sq. ft. of accommodation arranged over two floors. On the ground floor is a hallway with stairs to the first floor, with an understairs cupboard, a sitting room overloo...
Key features
- Semi-detached cottage
- Three bedrooms
- Family bathroom
A two bedroom end of terrace property with an open plan ground floor, a first floor bathroom and a courtyard garden with allocated parking in a village location. Set in the centre of the village of Aspley Guise, this brick under slate property has approximately 687 sq. ft. of accommodation arrang...
A FANTASTIC NEW PRICE FOR WHAT CAN ONLY BE DESCRIBED AS A BEAUTIFUL MAISONETTE, WITHIN THIS PRSTIGEOUS VILLAGE LOCATION! This large well presented one-bedroom ground floor maisonette is sat within the tranquil and highly sought after village of Aspley Guise in Bedfordshire. This chain free proper...
Key features
- Immaculate One Bedroom Ground Floor Maisonette
- Own Entrance And private Landscaped Garden
- Perfect For First time Buyers Or Downsizers!















































