Properties For Sale in Caldecotte, Milton Keynes, Buckinghamshire
Set on Monellan Crescent in the desirable lakeside location of Caldecotte, this exceptional five- bedroom townhouse offers over 2,460 sq ft of thoughtfully arranged living space across four floors. With enviable views over Caldecotte Lake and the surrounding parkland maintained by the Parks Trust...
A superb, 4-storey, 5-bedroom home within a terrace of houses built in 1998 in a striking arc around Caldecotte Lake. Inspired by Bath’s renowned, Georgian ‘Royal Crescent’, the design takes full advantage of wonderful views across the water, with both a terrace and balcony f...
Key features
- Luxurious lakeside, 4-storey, 5-bedroom home
- Built in the style of Bath's renowned, Georgian 'Royal Crescent'
- With peaceful and private, landscaped walled garden
Set on Monellan Crescent in the desirable lakeside location of Caldecotte, this exceptional five- bedroom townhouse offers over 2,460 sq ft of thoughtfully arranged living space across four floors. With enviable views over Caldecotte Lake and the surrounding parkland maintained by the Parks Trust...
Key features
- Five-bedroom townhouse across four floors
- Views over Caldecotte Lake and parkland
- En-suite facilities to every bedroom
A modern four bedroom detached property with front and rear gardens, a separate double garage, and parking for four cars located in Caldecotte. The property has approximately 1,643 sq. ft. of accommodation over two floors. On the ground floor, the entrance hall has stairs to the first floor with ...
Key features
- Detached property
- Four bedrooms
- Family bathroom, two en suite shower rooms
A four bedroom detached property with a separate home gym, a double garage and parking on a corner plot in Caldecotte. The property has approximately 1,455 sq. ft. of accommodation over two floors. The entrance hall has two built-in cupboards, stairs to the first floor, and access to a cloakroom....
A modern four bedroom terraced town house with three reception rooms, private residents’ parking, with terraces and a balcony overlooking nearby Caldecotte Lake. The property has in excess of 2,100 sq. ft of accommodation arranged over four floors. On the ground floor there is an entrance h...
Key features
- Four storey town house
- Four double bedrooms
- Three bath or shower rooms, two of which are en suite
Key features
- Stunning duplex penthouse apartment
- Balconies on both floors overlooking the water
- Open plan, modern interior and living space
Key features
- BEAUTIFULLY RENOVATED THREE BEDROOM FAMILY HOME
- LINKED DETACHED
- STYLISH LOUNGE
This beautifully presented and thoughtfully renovated three-bedroom linked-detached home occupies a generous plot in a highly desirable location just a few minutes’ walk from Caldecotte Lake. Offering an ideal blend of modern upgrades and future potential, the property also benefits from excellen...
Key features
- Link detached property on a good size plot
- Three bedrooms
- Renovated inside and out
Key features
- BRAND NEW DEVELOPMENT
- TWO DOUBLE GLAZED BEDROOM APARTMENT
- OPEN PLAN LIVING
Reserve in October for £5000 deposit contribution A beautifully presented home featuring a modern fitted kitchen with contemporary finishes, seamlessly flowing into a spacious living area. To the rear, an impressive enclosed garden. Plot 4 is a TWO BED apartment.
Key features
- **SHOW HOME NOW OPEN** MOVE IN BY CHRISTMAS
- Studio, One and Two bed apartments available
- 63 LUXURY APARTMENTS
Situated in a highly sought-after location within South East Milton Keynes, just a short walk from the picturesque Caldecotte Lake, this exceptionally well-presented three-bedroom home is an ideal purchase for first-time buyers and young families alike. The property enjoys excellent conn...
BLACK & WHITE are delighted to offer this executive TWO-bedroom apartment located in the sought-after area of Caldecotte Lake. The property benefits from Lake views- Completely renovated with lounge/diner, open plan kitchen, bathroom, En suite to master,private gated parking
MOVE IN FOR CHRISTMAS Plot 10 is ONE BED apartment with GARDEN. More than just a collection of homes, Caldecotte Lake is a vibrant community, offering residents a unique blend of modern design, comfort, and convenience - all set against the tranquil backdrop of the lake.
MOVE IN FOR CHRISTMAS. This exceptional living space is a standout feature of the home, boasting expansive dual-aspect windows that showcase beautiful panoramic views while filling the room with natural light. Plot 28 is a TWO BED apartment within our Caldecotte Lakes development.
Key features
- One and Two bedroom Apartments Available
- ******SHOW HOME AVAILABLE TO VIEW******* MOVE IN FOR CHRISTMAS
- 63 LUXURY APARTMENTS
Plot 18 is a beautifully appointed one-bedroom apartment within the prestigious Caldecotte Lake Residential development. Set in an elegant four-storey building with high-specification interiors and contemporary open-plan living, it offers the perfect blend of luxury, comfort and convenience.
Key features
- 63 LUXURY APARTMENTS
- STUDIO, ONE & TWO BEDROOM APARTMENTS AVAILABLE
- MORDEN PRIVATE RESIDENTS GYM
MOVE IN FOR CHRISTMAS Welcome to Caldecotte Lake Residential - an elegant new development. This building features 63 luxury apartments perfectly positioned near Caldecotte Lake in Milton Keynes. Plot 42 is a one bed apartment within the Caldecotte Lakes development.
"Move in for Christmas" More than just a collection of homes, Caldecotte Lake is a new vibrant community, offering residents a unique blend of modern design, comfort, and convenience - all set against the tranquil backdrop of the lake. Plot 46 is a One Bed Apartment
Key features
- *****SHOW HOME NOW OPEN***** Move in for Christmas
- Reserve in October for £5000 towards stamp duty
- Low Maintenance property
Well presented first floor apartment in sought-after Caldecotte, close to the lake. Comprising double bedroom with built-in wardrobe and Juliette balcony, open plan living/kitchen with second balcony, bathroom, allocated parking, uPVC glazing and gas heating.
Key features
- First Floor Apartment
- One Double Bedroom
- Open Plan Living Area
MOVE IN FOR CHRISTMAS. More than just a collection of homes, Caldecotte Lake is a vibrant community, offering residents a unique blend of modern design, comfort, and convenience - all set against the tranquil backdrop of the lake. Plot 22 is a ONE BED apartment.
Key features
- IDEAL FIRST HOME AND BE MOVED IN FOR CHRISTMAS
- 63 LUXURY APARTMENTS
- Studio, one and two bedroom apartments available









































