Properties For Sale in DT2
Offered with no forward chain and found within an Area of Outstanding Natural Beauty, is this detached bungalow ideally situated in the popular village of Cattistock, near the upper reaches of the Frome Valley. The property offers expansive living accommodation throughout and presents an excellen...
A period house situated in the unspoilt beauty of West Dorset. Providing a combination of privacy and spectacular views, Higher Waterston’s beautiful grounds and rolling paddocks are complemented by superb secondary accommodation and outdoor facilities - ideal for those who are looking t...
Key features
- Substantial eight-bedroom unlisted Georgian farmhouse
- Extensive equestrian facilities with multiple stables, tack room and barn
- Privately positioned within approximately eight acres
Key features
- Located in the heart of Hardy's Wessex
- About a mile to the popular village of Piddletrenthide
- Beautiful farmhouse with established successful business
An exquisite family home tucked away on the edge of a picturesque and much sought-after village which has been sympathetically upgraded, set in the most delightful gardens and grounds (of approximately 5 acres) with a separate bothy and three bedroomed lodge. THE PROPERTY Tucked ...
Tucked away on the edge of the most sought after and charming village of Cerne Abbas and sitting elegantly in its own beautiful valley, Cerne Park Farm is a most impressive family home, extensively renovated with far reaching views surrounded by its own delightful grounds. (approx 31.42 acres)
Key features
- Five Bedroom Barn Conversion
- Semi Rural Location
- Short Distance From Coastal Path And Beaches
A Grade II listed house, just one mile from the beach, that has been in the same ownership for 46 years. In need of some updating, the house is currently arranged for multi-generational living but could easily be reverted into a single dwelling. The house offers two entrance halls, a sitting room...
An impressive contemporary village home situated in a popular Dorset village, with a stunning terrace, large garden, extensive outbuildings, office, studio and workshop. Set in just under 3 acres Lower Farm Barn, is a beautifully presented barn conversion which combines period features and conte...
This is the former home of William Barnes, a poet, churchman, and philologist who resided there from 1862 until his death in 1886. It is situated in the tranquil village of Came, just outside the historic market town of Dorchester. It is an impressive Grade II listed, thatched roof home, inspired...
Set within approximately 1.67 acres of beautifully curated grounds, Old Came Rectory is a remarkable Grade II Listed residence, inspired by influential architect John Nash, offering a rare opportunity to acquire a home of exceptional character, history, and refined elegance. Located in t...
Key features
- Set within approximately 1.67 acres of beautifully curated grounds
- A rare opportunity to acquire a home of exceptional character with no forward chain
- Inspired by influential architect John Nash
A striking block of 134 acres of chalk downland, with consistently high arable yields characteristic of the chalk geology. The land benefits from free-draining soils and reliability across a range of cropping rotations, and is currently farmed in-hand. Landlords Knapp enjoys an elevated setti...
A substantial family home, tucked away along a wooded lane, with five beautiful bedrooms and delightful gardens. A true hidden gem close to all the excellent amenities in Dorchester THE PROPERTY Approached via a long gravel drive, with woodland on either side, first glimpses of th...
An extended former farmhouse with large barn situated in a popular, small Dorset village with easy access to Dorchester and the Jurassic coast. A large village house which has been thoughtfully extended to offer over 5700 sq ft of accommodation. The original house is constructed of sto...
An extended former farmhouse with large barn, situated in a popular, small Dorset village with easy access to Dorchester and the Jurassic Coast. A large village house which has been thoughtfully extended to offer over 5700 sq ft of accommodation. The original house is constructed of stone elevat...
The St Quintin Property Group are delighted to offer to the market place for the first in 32 years this stunning example of a well established country pub set in the heart of the sublime Dorset Countryside. Perfectly positioned attracting clientele for many years from Wareham, Dorchester, Weymout...
An exceptional Grade II listed family home with five beautiful bedrooms, 6.4 acres of pastureland, and the possibility of acquiring further land by separate negotiation. THE PROPERTY First glimpses of this wonderful mid-17th century property are most impressive, with its hugely a...
Owners say, "We've cherished the calm, the views, and the ever-changing garden. The separate coach house has created rewarding holiday income and could be a potential annexe (ask agent). It’s private yet close to everything we need. A truly special place to call home."
Key features
- Peacefully situated 5-bedroom period former farmhouse
- Detached 2-bedroom coach house
- Elevated position with fabulous far-reaching rural views
A versatile residential smallholding set in the West Dorset National Landscape, offering exceptional rural views. Comprising a five-bedroom period farmhouse, adaptable range of traditional and modern farm buildings with alternative use potential, set in a plot extending to approximately 2.94 acr...













