5 Bedroom Houses For Sale in Dorset
Occupying a highly desirable position within easy walking distance of the historic town centre of Shaftesbury, this elegant five-bed detached residence presents a fine example of a traditional family home, offering spacious and well-balanced accommodation.
An impressive townhouse arranged over three floors and forming part of an exclusive bespoke development of just six homes in Paddock Close, Shaftesbury. Featuring a stylish open plan kitchen-diner kitchen with central island, principle suite with en-suite bedroom, including a superb top-floor "Ja...
Key features
- Peace of mind - 10 year New build warranty
- Exclusive Bespoke Development of Just Six Homes
- Three Bathrooms Plus Ground-Floor WC
Price Guide £425,000 to £435,000. A fully licensed six-bedroom HMO investment with six en suite shower rooms, generating approximately £48,000 per annum at full occupancy. This established semi-detached investment is presented in good condition and offers an attractive gross yield of approx 11%.
** GUIDE PRICE £415,000 - £420,000 ** *1479 SQAURE FEET & SEA VIEWS* A true gem, set in a fantastic location is this extremely spacious and well presented turn of the century 5 bedroom, 2 bathroom, 2 reception room home set with distant views out to Holes Bay. Built in 1903, an...
***GUIDE PRICE: £400'000 - £435'000*** This FIVE DOUBLE BEDROOM DETACHED HOUSE benefits from a LARGE OPEN PLAN LOUNGE/DINER, MODERN KITCHEN, GARAGE CONVERSION providing an ADDITIONAL BEDROOM/SECOND RECEPTION OR PERFECT TO RENT SEPERATELY, a LARGE STUNNING GARDEN, and is situated in the sought-aft...
Substantial five/six bedroom detached property in a popular residential location. Previously operated as a licensed HMO with Gas Safety and EICR certification available. Offering flexible accommodation, private garden and excellent investment or family home potential.
Key features
- Five/Six Bedroom Detached House
- Former Licensed HMO with Compliance Documentation
- Valid Gas Safety & EICR Certificates Available
This FIVE BEDROOM SEMI-DETACHED HOUSE benefits from an EXTENDED OPEN-PLAN KITCHEN, SITTING AND DINING SPACE, a GROUND FLOOR BEDROOM WITH EN SUITE, a LOFT BEDROOM WITH ITS OWN WC, a GARDEN OFFICE/CINEMA ROOM and OFF-ROAD PARKING, and is located on Mossley Avenue, Poole.
Key features
- Immaculately Presented Five Bedroom House
- Master Bedroom En-Suite
- Family Bathroom And Additional Shower Room
A detached, extended and versatile FOUR DOUBLE BEDROOM, one single bedroom, one bathroom, one shower room character house with a 100 FT REAR GARDEN, having been used as an investment rental for over 20 years with continual income through Bournemouth University.
Flexible 4–5 bedroom refurbished semi with open-plan living and driveway parking Recently refurbished and ready to move into, this spacious 4–5 bedroom semi-detached home on Stewart Road offers flexible living and a bright open-plan layout designed for modern life. At the rear of the property i...
Key features
- Recently Refurbished Throughout
- Flexible 4–5 Bedroom Layout
- Large Open-Plan Lounge, Kitchen And Dining Area
A very generous, extended 5 bedroom semi-detached family home, benefitting from a lounge/dining room with fireplace, further sitting room and a central refitted kitchen/dining room, that forms the heart of the home. The home sits on a prominent corner position with front garden and rear access...
Key features
- End Terrace House
- Five Bedrooms
- En Suite Shower Room
Presenting this well-appointed detached student house, ideally positioned just 1.4 miles from Bournemouth University and moments from the vibrant amenities of Winton High Street, this property offers a superb blend of comfort, convenience, and functionality for student living.
Adams Property Agents are delighted to offer for sale this spacious five-bedroom semi-detached house, located on Somerley Road, Winton, Bournemouth. This property offers versatile accommodation, making it an excellent opportunity for both families seeking generous living space and investors look...
**STUDENT INVESTMENT – FIVE DOUBLE BEDROOMS** Fully furnished five-bedroom shared house close to Bournemouth University’s Talbot Campus, shops and transport links. Featuring two bathrooms, a modern open-plan kitchen/living area and a private rear garden. Re-let for September 2026 at **£2,500 PCM...




















