Properties For Sale in Toller, Dorchester, Dorset
An exquisite family home tucked away on the edge of a picturesque and much sought-after village which has been sympathetically upgraded, set in the most delightful gardens and grounds (of approximately 5 acres) with a separate bothy and three bedroomed lodge. THE PROPERTY Tucked ...
A striking block of 134 acres of chalk downland, with consistently high arable yields characteristic of the chalk geology. The land benefits from free-draining soils and reliability across a range of cropping rotations, and is currently farmed in-hand. Landlords Knapp enjoys an elevated setti...
A substantial family home, tucked away along a wooded lane, with five beautiful bedrooms and delightful gardens. A true hidden gem close to all the excellent amenities in Dorchester THE PROPERTY Approached via a long gravel drive, with woodland on either side, first glimpses of th...
Visit our newly launched homes and discover more about life at The Hamlet. Located in Poundbury, the Corfe is a beautifully designed four-bedroom detached home, offering generous living space alongside the timeless architectural character that defines the area.
Key features
- RESERVE now with up to £50,000* towards your purchase - MOVE IN FOR Christmas
- Exquisite three storey detached townhouse in the heart of Poundbury ready to move in before the end of 2026
- Stunning open-plan kitchen, breakfast & family room, complemented by separate dining room & study
Key features
- An elegant and beautifully appointed second floor apartment in this landmark building
- Generously proportioned throughout with two terraces
- Principal master suite with dressing room and ensuite, two further double bedrooms and, two shower rooms
Key features
- Characterful five-bedroom farmhouse in approx. 4.7 acres
- 3 generous reception spaces incl. an impressive orangery
- Refitted kitchen and three beautifully updated bathrooms
A prestigious Grade II listed, four-bedroom family home with four reception rooms, beautiful gardens, and approximately half an acre of grounds, set within the highly sought-after village of Long Bredy in the picturesque Bride Valley. THE PROPERTY Situated on the edge of the charm...
A highly desirable, detached four-bedroom property offering an exceptional standard of living in the sought-after area of Poundbury. Found in an area of outstanding natural beauty, this double fronted home has a wealth of light and spacious, beautifully presented accommodation. The home comprises...
A spacious and well-presented four-bedroom home situated in the highly sought-after development of Poundbury, within an area of outstanding natural beauty. The property offers versatile family accommodation, including a bright dual-aspect kitchen/diner, separate utility room and generous lounge w...
Key features
- Home of the month with owner occupier stamp duty paid
- Period style character home with all the benefits of new build
- Stylish blue shaker kitchen with integrated appliances and sleek stone work tops
There is something rather special about High Ridge House. Proudly positioned just below the western ridge, with far-reaching views across the Charminster Valley, this architecturally designed home was commissioned by the Druce family and offers a wonderful sense of space and flexibility for mo...
Key features
- Detached chalet bungalow
- Four bedrooms
- Sea views
Positioned in the heart of the PRESTIGIOUS Poundbury development, WISHAY HOUSE is an EXTRAORDINARY semi-detached residence that has been meticulously REDESIGNED to create one of the area's most VERSATILE and DISTINCTIVE homes. Beautifully modernised throughout, this exceptional property effortles...
Key features
- Exceptional Four Bedroom Residence with Self-Contained Two Bedroom Annex
- Outstanding Holiday Let & Income Generating Potential
- Architecturally Redesigned & Beautifully Modernised Throughout

























