Properties For Sale in MK17
A Grade II listed four bedroom detached cottage with an enclosed south facing rear garden, a gated driveway and double garage, situated in the village of Whaddon. The property has approximately 1,673 sq. ft. of accommodation over two floors which includes an entrance porch with a cloak cupboard, ...
*** GUIDED PRICE £425,000 - £450,000 *** Nestled within the tranquil cul-de-sac of George Close in the Glebe Farm area of Milton Keynes, this double-fronted detached residence epitomises modern family living. Upon entering, one is greeted by a spacious entrance hall leading...
Offered for sale with no above chain is this delightful period semi detached house situated in the much sought after area of Aspley Guise. Extended to the rear and with a loft conversion providing a third bedroom. The property is well presented and benefits from a generous rear garden.
A Victorian refurbished two double bedroom semi detached cottage with a landscaped rear garden, within walking distance of village amenities. The property has 775 sq. ft. of accommodation over two floors. On the ground floor there is a sitting room with a feature fireplace and a wood burning stov...
A Georgian three bedroom double fronted detached house with a separate one bedroom annexe, a drive with a garage and an enclosed rear garden in a village location. This period property has a combined approximate 2.394 sq. ft. of versatile accommodation arranged over three floors. On the ground fl...
A very quaint three bedroom cottage set in the village of Newton Longville with private secluded gardens. The main front part of the property dates back to the 1850`s with a rear two storey extension added approximately 20 years ago to provide extra accommodation.
A combination of rustic charm and contemporary flair awaits you at this picturesque, newly converted barn conversion. Positioned in a secluded location in the serene Buckinghamshire countryside, on the outskirts of the gorgeous village of Great Brickhill. The property boasts over 3,000 square foo...
**Part exchange considered**A Distinguished Late Victorian Residence sitting on approximately an acre of grounds.Set within the prestigious village of Aspley Guise, Larchfield is a striking and elegant late Victorian property steeped in history and character. With approximately 5...
Nestled in the historic hamlet of Tingrith, the charming Gardeners Cottage (on the corner of High Street and Church Road) offers a perfect blend of comfort and character. This property provides ample space for relaxation and entertaining. The cosy atmosphere is enhanced by the traditional feature...
Immaculately presented three bedroom detached property situated in Glebe Farm. The accommodation comprises of an entrance hall, cloakroom, lounge, kitchen/diner, utility room, three bedrooms one with a dressing area and en-suite shower room, family bathroom, rear garden and off-road parking.
Introducing this beautifully extended 4-bedroom semi-detached home located in the charming village of Drayton Parslow. This delightful property offers a perfect blend of space and comfort, ideal for family living. Upon entry, you are welcomed into a spacious living room that seamlessly flows i...
Situated in the sought-after village of Newton Longville is this three-bedroom semi-detached family home offered to the market with no chain. The property comprises an entrance hall, lounge, dining room, kitchen and family bathroom. Externally the property benefits from front and rear gardens wit...
MA0187 MA1087 DETACHED - LARGE PLOT APPROX 0.3 ACRES - FIVE BEDROOMS - FIVE RECEPTION ROOMS - THREE BATHROOMS - KITCHEN BREAKFAST ROOM - PARKING FOR SIX CARS - DOUBLE GARAGE. Set down a private road accessed by only one other house this magnificent Home is set amongst glorio...
*** LAST REMAINING PLOT! - READY TO MOVE INTO! *** This EXCLUSIVE THREE BED home boasts a SPACIOUS and HIGH SPEC OPEN PLAN KITCHEN/DINER with FULLY INTEGRATED APPLIANCES, FRENCH DOORS leading to a PRIVATE LANDSCAPED REAR GARDEN, EN SUITE to the MASTER BEDROOM, DOWNSTAIRS CLOAKROOM and ALLOCATED P...