Properties For Sale in Pinfoldpond, Milton Keynes, Buckinghamshire
FLOORING INCLUDED. Energy-efficient new family home with open-plan Kitchen/Dining/Family Area featuring Bosch, Siemens and Quooker appliances and separate Utility. Two En Suite shower rooms, built-in wardrobes and double garage with driveway.
Beautiful Four Bedroom Detached New Build with Double Garage in Stoke Hammond. Situated on an attractive new development in the sought after village of Stoke Hammond, this impressive four bedroom detached home offers spacious, modern living designed with today’s families in mind....
Offered for sale with no upper chain, 'Rosedene' is set within a highly desirable semi-rural location, enjoying delightful countryside views. Positioned on a generous plot, this detached home presents an excellent opportunity, having potential to improve or extend (subject to planning). ...
Beautiful Four Bedroom Detached New Build with single Garage – Stoke Hammond Situated on an attractive new development in the sought after village of Stoke Hammond, this impressive four bedroom detached home offers spacious, modern living designed with today’s familie...
Mallaig...Where Dreams Come True. No expense has been spared in the top to bottom renovation of this now turn key ready detached bungalow in Stoke Hammond. Set down a prestigious, quiet lane backing directly onto the countryside, privacy is the order of the day in this delightful locatio...
STAMP DUTY PAID^. The Loxwood has 1473sq ft of living space. Bosch and Siemens integrated appliances included in the Kitchen/Family Area, En Suites to each bedroom, and Air Source Heat Pump for energy efficiency. Single garage, driveway parking and located at the back of the development.
AN ESTABLISHED FOUR BEDROOM SEMI DETACHED PROPERTY ENJOYING A QUIET LOCATION AND PRESENTED TO A HIGH STANDARD THROUGHOUT. THE PROPERTY This mature semi-detached property has been thoughtfully extended and provides a spacious family home situated close to the centre of this sought ...
Beautiful Four Bedroom Detached New Build in Stoke Hammond with off road parking. Situated on an attractive new development in the sought after village of Stoke Hammond, this impressive four bedroom detached home offers spacious, modern living designed with today’s families in mi...
£15,000 STAMP DUTY CONTRIBUTION^. The Beazley is a stunning 3 bedroom detached home and benefits from not being overlooked by any other plots. Integrated appliances in the Kitchen, separate Dining Room, Living Room, Utility Cupboard and 3 double bedrooms. VISIT US TODAY TO RESERVE
A beautiful Tudor cottage located in the heart of a peaceful village moments away from the Rushmere and Stockgrove country parks and a short walk from the village pub. The accommodation includes an entrance hall, cloakroom, features a spacious kitchen/breakfast room, two large reception rooms wit...
The Westcott is a stunning home with drive-through, parking, garage, a fitted designer Kitchen with doors to the Garden, spacious Living Room and four bedrooms with the Principal Bedroom featuring an En Suite and built-in wardrobe. READY TO MOVE IN
A 1970s three bedroom detached house with landscaped front and rear gardens, driveway, and a garage in a village location. This modern property has approximately 1,510 sq. ft. of accommodation including on the ground floor: an L-shaped entrance hall with cupboards and stairs to the first floor la...
*** VIEW OUR VIDEO TOUR *** A RARELY AVAILABLE EX DUKE OF BEDFORD ESTATE HOUSE WITH OVER 100 FT GARDEN AND A DOUBLE GARAGE SET IN THIS CAREFULLY PRESERVED AND HIGHLY SOUGHT AFTER VILLAGE. Set in New Water End with countryside all around and without having to cross a road, delightf...
A CHARMING END OF TERRACE BAY FRONTED COTTAGE SITUATED ONLY A SHORT WALK FROM THE VILLAGE CENTRE. THE PROPERTY A delightful end of terrace bay fronted cottage located only 200 metres from the village centre. GROUND FLOOR A solid hardwood door opens to the entrance ...
Three Bedroom New Build Home with Carport in Stoke Hammond Located on a desirable new build development in the village of Stoke Hammond, this attractive threebedroom home offers wellplanned accommodation ideal for modern living. The ground floor features a welcoming entrance hall ...
This chain-free character home is set within a highly desirable semi-rural location, enjoying delightful walks and far-reaching views across surrounding countryside with the magnificent Woburn Deer Park just a 0.4 mile stroll away. The property is entered though a spacious hallway, leading to ...
Immaculate Three-Bed Detached Home – High-Quality Finish – Bespoke Fixtures & Fittings – Underfloor Heating – Spacious Kitchen/Diner – Detached Garage & Driveway – Landscaped Rear Garden – Quiet Cul-de-Sac Location – Sought-After Meadow Broo...
This rarely available three bedroom Duke of Bedford cottage is tucked away within the sought after enclave of New Water End, surrounded by rolling countryside and offering well proportioned, versatile accommodation throughout. The property is approached via a shared shingled driveway w...
A Victorian double fronted four bedroom semi detached cottage situated in the village of Bow Brickhill. This period brick under slate property has 1,385 sq. ft. of accommodation arranged over two floors. On the ground floor there are two reception rooms with bow windows overlooking the front: a s...
STAMP DUTY PAID* + UPGRADES WORTH £7,666. SOUTH FACING GARDEN. *PLOT 72 - MAIDSTONE AT WOBURN DOWNS*. The Maidstone is a three bedroom family home. Downstairs is a spacious lounge leading to a fully-fitted contemporary open-plan kitchen/diner with French doors leading to the garden. Going upstair...















































