Properties For Sale in Sturminster Newton, Dorset
Express Mover available^. Brand new, chain free and energy efficient, The Chandler boasts an OPEN-PLAN kitchen & dining area with French doors to the garden, living room with a bay window, EN SUITE to bedroom 1 & a 10-year NHBC Buildmark policy^.
Set in the heart of Dorset, Walton Elm House is an exceptional late Georgian/early Victorian country home of rare scale and character. Built from local stone and presented to immaculate standards, this unlisted residence combines period elegance tall sash windows, high ceilings with modern comfort.
Key features
- VENDOR SUITED
- Extensive gardens including a tennis court making the perfect family home.
- A heated swimming pool with an electric pool cover ensuring summer days are made the most of from your own home.
As the first home completed within the exclusive Banbury Cross Development, Maple House is an exceptional contemporary country home extending to over 3,600 sq. ft, set within approximately 1.5 acres and constructed to an outstanding specification throughout. The property combines striking modern ...
Key features
- 5 Bedrooms
- Viewings Are Restricted To Proceedable Buyers Only
- Exceptional Contemporary New-Build Home
Dating from the 19th Century, The Paddock is an attractive brick and rendered house under clay tile roof, sympathetically extended in 2003/2004 and more recently beautifully refurbished to create a wonderfully light and airy family home over two floors. On entering the house, one is greeted by an...
Key features
- Attractive 3-5 bedroom house in lovely rural location
- Linked annexe - 28' ground floor room and shower room
- Annexe - First floor bedroom, kitchenette and living room
A rare opportunity to acquire a charming Grade II listed thatched (the ridge was re thatched in 2020) farmhouse offering flexible and spacious accommodation, set in approximately four acres of gardens and paddocks, with an extensive range of outbuildings. The property is currently set up for eque...
A substantial Grade II listed seven-bedroom family home, offered to the market with the added benefit of no onward chain. Dating back to the 17th century with elegant 18th century additions, Vine House is bursting with period character and comes with a self-contained one-bedroom annexe, extensive...
This stunning modern Georgian-style home is the perfect blend of classic elegance and contemporary family living. Built from beautiful stone and offering an impressive 2,310 sq. ft. of space, it sits in a peaceful countryside setting with breathtaking views stretching towards Stourhead. ...
Key features
- Excellent family accommodation of about 2200 sq ft
- 4/5 bedrooms, 3 bath/shower rooms (2e/s)
- Sitting room with south facing terrace
*** VENDOR SUITED *** Presenting a remarkable opportunity to acquire a bespoke five bedroom detached family home, purposefully constructed in 2000 by its current owners, and majestically positioned on an elevated plot spanning approximately 0.4 acres, with breath taking countryside views.
Key features
- An Exceptional Five Bedroom Family Home
- Balcony with lovely views
- Garage / Workshop
Truly the best of both worlds – A charming and detached Grade II listed cottage and annexe with contemporary oak frame rear extension. Gardens and paddock amounting to approximately 1.21 acres, with stable/workshop and ample gated parking. No Onward Chain.
Key features
- Beautifully Presented
- Gardens & Grounds Of 1.21 Acres
- Stable/Workshop
A rare chance to purchase a substantial detached period residence offering around 2893 sq. ft (269 sq. m) of versatile space, situated in 0.6 acres of secluded grounds, boasting five double bedrooms, four reception rooms and located in the small hamlet of Puxey, which lies on the fringe of the ma...
Discover modern living at its finest in this beautifully designed double-fronted home, perfectly positioned within easy reach of both town and countryside. Built to the highest standards, this stunning property offers space, style, and sustainability in equal measure. Step inside to find...
Nestled in the quaint town of Sturminster Newton, this remarkable Victorian townhouse radiates timeless elegance over its three expansive floors. Designed with both historical charm and contemporary living in mind, this five bedroom residence stands as a testament to sophisticated style.


























