Properties For Sale in MK7
Enjoy a relaxed retirement lifestyle in this stylish one-bedroom apartment, featuring a bright living space, private balcony, modern kitchen and contemporary shower room. Beautiful gardens, a sociable communal lounge and 24-hour security provide comfort, community and peace of mind
A modern five bedroom detached property with an enclosed rear garden, a triple garage and driveway parking located in a cul-de-sac location overlooking Caldecotte Lake. Located in a close of similar properties, the property is accessed via electronically operated wrought iron gates and has approx...
Key features
- Detached property
- Five bedrooms, two en suite
- Three bath/shower rooms
A modern five bedroom detached property with a converted garage, driveway parking, and an enclosed rear garden overlooking paddocks located in Walnut Tree. The property has approximately 2,908 sq. ft. of accommodation set over two floors, on the ground floor, there is an entrance hall with a cloa...
Key features
- Detached property
- Five bedrooms, two en suite
- Three bath or shower rooms
Key features
- 5 BEDROOM DETACHED HOME
- 4 BATHROOMS
- OVER 3000 SQ FT OF SPACE
A modern five bedroom Neo-classical town house with accommodation over four floors with a detached double garage, a courtyard garden, and views towards Caldecotte Lake. The brick under slate property has approximately 2,450 sq. ft. of accommodation over four floors. On the ground floor there is a...
A superb, 4-storey, 5-bedroom home within a terrace of houses built in 1998 in a striking arc around Caldecotte Lake. Inspired by Bath’s renowned, Georgian ‘Royal Crescent’, the design takes full advantage of wonderful views across the water, with both a terrace and balcony f...
Key features
- Luxurious lakeside, 4-storey, 5-bedroom home
- Built in the style of Bath's renowned, Georgian 'Royal Crescent'
- With peaceful and private, landscaped walled garden
Offered for sale is this truly one-off executive detached family home, occupying a desirable corner plot at the end of a quiet cul-de-sac within the highly regarded area of Old Farm Park. This substantial and beautifully maintained property provides 2,300 sq ft of versatile accommodation...
Key features
- EXECUTIVE DETACHED FAMILY HOME
- 4 RECEPTION ROOMS
- RE-FITTED KITCHEN/BREAKFAST ROOM
Reserve Home 93 before October 31st and receive £33,500 towards Stamp Duty, plus a home upgrade package, worth over £13,000, including flooring throughout upgraded kitchen cabinetry, a hot tap, quartz kitchen worktops, turf to the garden, a rainfall shower and a shower pack...
Key features
- Five-bedroom townhouse across four floors
- Views over Caldecotte Lake and parkland
- En-suite facilities to every bedroom
MUST BE SEEN! FIVE BEDROOM DETACHED EXECUTIVE FAMILY HOME! SOUGHT AFTER LOCATION & SCHOOLING AREA! BEAUTIFULLY PRESENTED THROUGHOUT! OPEN KITCHEN/FAMILY ROOM WITH NEWLY INSTALLED ISLAND! OUTSIDE POOL ROOM/HOME OFFICE/STUDIO! DOUBLE GARAGE! WRAP AROUND PLOT/GARDEN! THE LIST GOES ON & ON... Offere...
Key features
- MUST BE SEEN!
- FIVE BEDROOM EXECUTIVE DETACHED FAMILY HOME
- PRESTIGIOUS RAVEL CLOSE LOCATION & SCHOOLING AREA
Key features
- Executive Detached Family Home
- Five Bedrooms
- Ensuite To Master & Guest Bedrooms
A modern four bedroom terraced town house with three reception rooms, private residents’ parking, with terraces and a balcony overlooking nearby Caldecotte Lake. The property has in excess of 2,100 sq. ft of accommodation arranged over four floors. On the ground floor there is an entrance h...
Key features
- Four storey town house
- Four double bedrooms
- Three bath or shower rooms, two of which are en suite
A four bedroom detached property with a separate home gym, a double garage and parking on a corner plot in Caldecotte. The property has approximately 1,455 sq. ft. of accommodation over two floors. The entrance hall has two built-in cupboards, stairs to the first floor, and access to a cloakroom....
A modern four bedroom detached property with front and rear gardens, a separate double garage, and parking for four cars located in Caldecotte. The property has approximately 1,643 sq. ft. of accommodation over two floors. On the ground floor, the entrance hall has stairs to the first floor with ...
Key features
- Detached property
- Four bedrooms
- Family bathroom, two en suite shower rooms
A six bedroom detached property with a double garage, parking for two cars and an enclosed rear garden located in a cul-de-sac position, available with no onward chain. The property has accommodation of over 2,560 sq. ft. arranged over three floors and includes an entrance hall with stairs to the...
Key features
- Detached three storey property
- Six bedrooms
- Three bath or shower rooms
Key features
- Executive 4-bedroom detached home in Old Farm Park, Milton Keynes – prime family location in a quiet cul-de-sac
- Catchment for Outstanding Ofsted-rated schools – ideal for families prioritising education
- Recently installed grey double glazing windows & doors throughout – modern finish + improved energy efficiency
Nestled in the desirable area of Shuttleworth Grove, Wavendon Gate, Milton Keynes, this impressive four-bedroom detached family home offers a perfect blend of space, comfort, and modern living. Set on a secluded corner plot, the property boasts a generous driveway that accommodates up to four veh...










































