Properties For Sale in MK17
A SUPERB PERIOD HOUSE SET IN 2.3 ACRES OF PRIVATE, MANICURED GROUNDS WITH A LARGE ANNEX AND SEPARATE STAFF ACCOMMODATION, FIVE VEHICLE GARAGING, LOCATED IN HIGHLY SOUGHT-AFTER VILLAGE OF MILTON BRYAN WHICH BORDERS THE DUKE OF BEDFORD’S WOBURN ESTATE. Coming to the market for the ...
A beautifully presented Queen Anne Listed Manor House enjoying an idyllic setting in the heart of the village. Salford Manor is a fine example of a Grade II Listed property dating from the early 18th century and enjoying a very private position in the heart of the village. The propert...
Key features
- STUNNING MANOR HOUSE
- PRESENTED IN EXCELLENT CONDITION
- ENJOYING A PRIVATE POSITION
A rare opportunity to acquire a substantial country property, offering exceptional flexibility to suit a range of purchasers. The property comprises a well-appointed residence with extensive landscaped gardens and the opportunity to purchase additional land to suit your requir
Key features
- Detached thatched country residence
- Surrounded by established formal gardens
- Five bedrooms and four bath/shower rooms
Key features
- Landscaped gardens backing onto Aspley Guise Golf Club
- Kitchen, dining and family room of over 40 ft, with log burner and full width terrace
- Full width lower ground floor entertaining space with bespoke bar and media wall
A newly built four bedroom detached house with underfloor heating through out on a nearly 0.5 acre plot with off street parking, an enclosed rear garden and potential for a separate one bedroom annexe situated on a private lane in the heart of Aspley Guise. This modern building project, with acc...
Key features
- Contemporary detached house
- Elements of building project need completion
- Five bedrooms, four bathrooms
A distinguished 17th century former tavern, beautifully evolved into a substantial five-bedroom detached residence including an adjoining annexe, extending to over 3,000 sq ft, blending centuries of history with versatile family accommodation, mature gardens and exceptional character.
AN EXTREMELY IMPRESSIVE SIX BEDROOM DETACHED PERIOD PROPERTY OFFERING SUBSTANTIAL LIVING ACCOMMODATION ENJOYING AN ABUNDANCE OF CHARACTER AND CHARM. THE PROPERTY Church Farm is a beautifully presented Grade II detached property enjoying a slightly elevated position and set in deli...
Key features
- OVER 3,900 SQUARE FEET OF ACCOMMODATION
- GRAND ENTRANCE HALL
- FOUR RECEPTION ROOMS
Offering nearly 4500 square feet of living space this exquisite family home has period charm with original parts dating back to 1670 mixed with modern luxury. This immaculately presented grand family home enjoying a 0.25 acre plot is offered for sale for the second time in nearly a century. Elega...
Key features
- A rarely available beautifully presented five bedroom detached family home in a prestigious location.
- Gorgeous curb appeal with large driveway, and mature front gardens.
- Four spacious reception rooms downstairs, perfect living space for the family home.
A spacious bungalow with land in a secluded position within the highly desirable village of Aspley Guise, offering versatile and well proportioned accommodation throughout, with great potential for extension or further development (subject to relevant planning permission).
Key features
- 4 Bedroom detached
- Set in grounds of approximately 10 acres
- A high degree of privacy
Set within approximately 1.41 acres with jaw dropping views, this six-bedroom barn conversion in Great Brickhill is available on the open market for the first time since the early 1980's, offering over 4000 square feet of spacious and versatile accommodation. With character features throughout, t...
Key features
- Impressive six-bedroom barn conversion family home in the sought-after village of Great Brickhill.
- Set within a generous 1.41-acre plot with beautiful countryside views.
- Spacious and versatile accommodation measuring over 4000 square feet with character features throughout.
Cottage Farm occupies a truly idyllic position within the sought after hamlet of Wood End, Tingrith, offering an increasingly rare opportunity to acquire a charming country home set within approximately 4.92 acres of beautifully established grounds. Surrounded by open Bedfordshire countryside, th...
A five bedroom detached bay fronted house with driveway parking, an established rear garden with a home office, and an integral garage situated on the edge of the Woburn Estate in Aspley Heath. With original parts over 150 years old and later additions, this double fronted brick under slate prope...
Key features
- Period detached house
- Five bedrooms; two en suite
- Four reception areas
SET ON A SECLUDED AND GATED PLOT IN ONE OF THE MOST SOUGHT-AFTER PRIVATE ROADS IN ASPLEY GUISE, AN IMMACULATELY PRESENTED FAMILY HOUSE PERFECT FOR MODERN DAY LIVING. A rarely available detached house set in Mentone Avenue, bordering the Duke of Bedford’s woodland with delig...































