Detached Houses For Sale in Milton Keynes, Buckinghamshire
A Grade II listed Georgian former Rectory with annexe potential, over 3,000 sq. ft. of outbuildings including a converted former coach house and quadruple garaging, secure gated parking, and approximately 1.8 acres of gardens and grounds on a secluded plot with views of the church in Shenley Chur...
Key features
- Grade II listed Georgian former Rectory
- Seven bedrooms, seven bath or shower rooms
- Six reception rooms
Key features
- Magnificent Grade II listed Georgian family home
- Extensively renovated and restored in 2023
- Striking architect-designed kitchen extension
AN IMPOSING AND MOST STYLISHLY PRESENTED GEORGIAN HOUSE SET IN PRIVATE AND GATED GROUNDS OF 0.75 OF AN ACRE IN THE HEART OF SHENLEY CHURCH END. Shenley Park House is a fine example of a classically proportioned and comprehensively restored Georgian house with future-proof technology fe...
Key features
- Offered with no onward chain
- Private 0.75 ace plot-outdoor kitchen, gym/sauna/hot tub
- Gated entrance, ample parking & double garage
A substantial early 18th Century Mill House with delightful riverside gardens and standing in about 23.74 acres predominantly catering for the equestrian enthusiast. Arranged around the property are various paddocks, American and additional stables, an all weather manege and horse walker.
A six bedroom three storey detached house with over 4,000 sq. ft. of versatile accommodation with annexe potential, gated driveway parking, a garage, and wraparound gardens in a cul-de-sac overlooking the historic Shenley Toot which is a Scheduled Monument with the remains of a motte and bailey c...
Key features
- Three storey detached house overlooking Shenley Toot
- Six bedrooms
- Five bath or shower rooms, cloakroom
A rare opportunity to acquire one of Buckinghamshire's most historically significant and versatile country homes, Little Loughton Manor seamlessly combines over 500 years of history with exceptional modern living. The magnificent Grade II* listed Manor House is complemented by a beautifully renov...
Key features
- AN IMPOSING FORMER MANOR HOUSE
- FIVE BEDROOMS
- THREE BATHROOMS
Thomas Connolly Estate Agents are delighted to introduce this exceptional six-bedroom detached residence, offering an outstanding level of accommodation, privacy and flexibility across the main house and a substantial purpose-built annexe. Extending to over 3,200 sq. ft. within the main reside...
Key features
- Substantial detached family home
- Bespoke fittings throughout having undergone major renovation
- 5 double bedrooms
A modern high specification five bedroom detached house with benefitting from a total footprint of 3,781 sq.ft. including a detached premium home office and gym, and double garage within walking distance of local amenities in Willen. The vendor has lived at the property since it was built in 200...
Key features
- Modern high specification detached house walking distance from amenities
- Five bedrooms, five bath or shower rooms
- Sitting room, dining room and snug
Nestled in the highly sought-after area of Woolstone, Milton Keynes, this magnificent detached house presents an exceptional opportunity for discerning buyers. Boasting an impressive five generously sized bedrooms and three modern bathrooms, this property offers ample space and comfort for a grow...
Key features
- Garage
- Home office
- Double glazing
SPANNING ACROSS 3200 SQ FT SHOW-HOME CONDITION Recently renovated to an exceptionally high standard this property certainly has the wow factor! The accommodation downstairs comprises of entrance hall, exceptionally spacious open plan kitchen diner with refitted kitchen wit...
Key features
- Air conditioning
- Under floor heating
- Off street parking
Thomas Connolly Estate Agents are delighted to introduce this exceptional seven-bedroom detached family home, occupying a highly private position within an exclusive cul-de-sac of just three properties in the sought-after area of Shenley Church End, Milton Keynes. Offering approximately 2,943 ...
Set in the heart of Haversham, a quiet and well-regarded Buckinghamshire village, Woodpecker Cottage is an architect-designed, stone-built home that genuinely rewards closer inspection. From the vaulted oak-beamed ceilings and air source underfloor heated tiled floors to the hand-finished oak ...
Key features
- OVER 2900 SQUARE FOOT OF INTERNAL LIVING SPACE
- INTERNAL ANNEXE
- DOUBLE GARAGE AND GENEROUS OFFROAD PARKING
Ideally positioned within the highly desirable location of Loughton this five bedroom detached family home is offered to the market with no upper chain with many benefits including three reception rooms, kitchen/diner, utility room, en-suites to two bedrooms, family bathroom and additional downst...
Key features
- FIVE BEDROOMS
- NO UPPER CHAIN
- THREE RECEPTION ROOMS
A modern extended five/six bedroom detached property, upgraded throughout by current owners, with a landscaped rear garden, an integral double garage and enclosed driveway. The property has approximately 2,764 sq. ft. of accommodation over two floors which includes an entrance hall with stairs to...
Key features
- Detached house
- Five/six bedrooms
- Three bathrooms
"Where Horses Roam” Occupying a fantastic corner plot on one of Loughton’s most desirable roads, this impressive detached residence offers a wealth of charm, generous proportions, five bedrooms, ample off-road parking, and a substantial rear garden. Conveniently located within w...






































