Properties For Sale in MK17
A GIFT FOR CHRISTMAS Make your move extra special this Christmas and reserve your new home by Thursday 24th December and choose a Gift for Christmas from the developer when you complete. * Four-bedroom home with a separate living room and study * * High-specification k...
A SUPERB PERIOD HOUSE SET IN 2.3 ACRES OF PRIVATE, MANICURED GROUNDS WITH A LARGE ANNEX AND SEPARATE STAFF ACCOMMODATION, FIVE VEHICLE GARAGING, LOCATED IN HIGHLY SOUGHT-AFTER VILLAGE OF MILTON BRYAN WHICH BORDERS THE DUKE OF BEDFORD’S WOBURN ESTATE. Coming to the market for the ...
Key features
- Landscaped gardens backing onto Aspley Guise Golf Club
- Kitchen, dining and family room of over 40 ft, with log burner and full width terrace
- Full width lower ground floor entertaining space with bespoke bar and media wall
A rare opportunity to acquire a substantial country property, offering exceptional flexibility to suit a range of purchasers. The property comprises a well-appointed residence with extensive landscaped gardens and the opportunity to purchase additional land to suit your requir
Key features
- Detached thatched country residence
- Surrounded by established formal gardens
- Five bedrooms and four bath/shower rooms
A newly built four bedroom detached house with underfloor heating through out on a nearly 0.5 acre plot with off street parking, an enclosed rear garden and potential for a separate one bedroom annexe situated on a private lane in the heart of Aspley Guise. This modern building project, with acc...
Key features
- Contemporary detached house
- Elements of building project need completion
- Five bedrooms, four bathrooms
A distinguished 17th century former tavern, beautifully evolved into a substantial five-bedroom detached residence including an adjoining annexe, extending to over 3,000 sq ft, blending centuries of history with versatile family accommodation, mature gardens and exceptional character.
AN EXTREMELY IMPRESSIVE SIX BEDROOM DETACHED PERIOD PROPERTY OFFERING SUBSTANTIAL LIVING ACCOMMODATION ENJOYING AN ABUNDANCE OF CHARACTER AND CHARM. THE PROPERTY Church Farm is a beautifully presented Grade II detached property enjoying a slightly elevated position and set in deli...
Key features
- OVER 3,900 SQUARE FEET OF ACCOMMODATION
- GRAND ENTRANCE HALL
- FOUR RECEPTION ROOMS
Offering nearly 4500 square feet of living space this exquisite family home has period charm with original parts dating back to 1670 mixed with modern luxury. This immaculately presented grand family home enjoying a 0.25 acre plot is offered for sale for the second time in nearly a century. Elega...
Key features
- A rarely available beautifully presented five bedroom detached family home in a prestigious location.
- Gorgeous curb appeal with large driveway, and mature front gardens.
- Four spacious reception rooms downstairs, perfect living space for the family home.
A spacious bungalow with land in a secluded position within the highly desirable village of Aspley Guise, offering versatile and well proportioned accommodation throughout, with great potential for extension or further development (subject to relevant planning permission).
Key features
- 4 Bedroom detached
- Set in grounds of approximately 10 acres
- A high degree of privacy
Set within approximately 1.41 acres with jaw dropping views, this six-bedroom barn conversion in Great Brickhill is available on the open market for the first time since the early 1980's, offering over 4000 square feet of spacious and versatile accommodation. With character features throughout, t...
Key features
- Impressive six-bedroom barn conversion family home in the sought-after village of Great Brickhill.
- Set within a generous 1.41-acre plot with beautiful countryside views.
- Spacious and versatile accommodation measuring over 4000 square feet with character features throughout.
Cottage Farm occupies a truly idyllic position within the sought after hamlet of Wood End, Tingrith, offering an increasingly rare opportunity to acquire a charming country home set within approximately 4.92 acres of beautifully established grounds. Surrounded by open Bedfordshire countryside, th...
A five bedroom detached bay fronted house with driveway parking, an established rear garden with a home office, and an integral garage situated on the edge of the Woburn Estate in Aspley Heath. With original parts over 150 years old and later additions, this double fronted brick under slate prope...
Key features
- Period detached house
- Five bedrooms; two en suite
- Four reception areas
SET ON A SECLUDED AND GATED PLOT IN ONE OF THE MOST SOUGHT-AFTER PRIVATE ROADS IN ASPLEY GUISE, AN IMMACULATELY PRESENTED FAMILY HOUSE PERFECT FOR MODERN DAY LIVING. A rarely available detached house set in Mentone Avenue, bordering the Duke of Bedford’s woodland with delig...
Key features
- Four-bedroom detached executive home
- Contemporary barn-inspired architecture
- Exclusive development of just five homes
No. 5 Little Horwood Manor ia a rare and spacious family home within one of Buckinghamshire's most architecturally distinguished country estates. Occupying an enviable position within Little Horwood Manor, with accommodation arranged over three floors and extending to more than 28...




































