Properties For Sale in Woburn Sands, Milton Keynes, Buckinghamshire
A beautifully presented, turnkey two-bedroom ground floor apartment in the sought-after location of Woburn Sands. Boasting a principal bedroom with en-suite, separate bathroom and excellent transport links. Ideally positioned for village amenities. Offered to the market chain free
Key features
- Landscaped gardens backing onto Aspley Guise Golf Club
- Kitchen, dining and family room of over 40 ft, with log burner and full width terrace
- Full width lower ground floor entertaining space with bespoke bar and media wall
A five bedroom detached bay fronted house with driveway parking, an established rear garden with a home office, and an integral garage situated on the edge of the Woburn Estate in Aspley Heath. With original parts over 150 years old and later additions, this double fronted brick under slate prope...
Key features
- Period detached house
- Five bedrooms; two en suite
- Four reception areas
Key features
- Four-bedroom detached executive home
- Contemporary barn-inspired architecture
- Exclusive development of just five homes
AN ESTABLISHED DETACHED BUNGALOW SET ON AN MATURE SECLUDED PLOT OF ABOUT HALF ACRE AND ADJOINING ASPLEY GUISE GOLF COURSE AT THE REAR. THE PROPERTY This rarely available detached bungalow has not been on the market for over forty years and offers an ideal opportunity to acquire a ...
Heritage Collection. Homes in this collection seamlessly merge the convenience of modern fixtures with the timeless style of a classic exterior inspired by Arts and Crafts heritage. This Eco Electric home benefits from underfloor heating and energy from an air source heat pump. The ground floor ...
An Edwardian four bedroom semi-detached house with two garages, parking, and gardens with far reaching countryside views from the rear situated on the edge of the Woburn Estate in Aspley Heath. Built in 1904, this bay fronted property has approximately 1,618 sq. ft. of accommodation arranged over...
Key features
- Edwardian semi-detached house
- Four bedrooms, family bathroom
- Two reception rooms
Key features
- Superb three bedroom home
- Exclusive development of just five homes
- Spacious open-plan kitchen, dining and family living
An early 1920s four bedroom semi detached house with driveway parking and a 150 ft. long rear garden with a detached outbuilding currently used as a home office/games room. The property has been extended and now has 2,177 sq. ft. of versatile accommodation. On the ground floor there is an entranc...
Key features
- Early 1920s semi detached house
- Four bedrooms
- Three bath or shower rooms
Tucked away within a quiet and established cul-de-sac, this impressive home offers an unusually generous amount of accommodation, providing the versatility to suit a growing family, those requiring space for home working or multi generational living, or simply anyone looking for a turnkey home.
Discover an elegant, spacious and effortlessly practical family home in The Oxford. This four-bedroom home is part of the Heritage Collection, so you can expect a classic exterior married with a modern interior designed for contemporary lifestyles. As well as underfloor heating and ultrafast broa...
Find the space you need for modern living with The Shrewsbury 3. Cleverly designed, this new build home offers the perfect mix of style and practicality. As well as the lounge, the ground floor features the open-plan kitchen/dining room, a cloaks with toilet, and a dedicated utility room. The Shr...
Key features
- Stunning Family home
- Sought after Woburn Sands area with excellent schooling locally
- Stylish Bespoke Kitchen / family room with By-folding doors
A modern four bedroom detached house with a carport with an up and over door, driveway parking and a private courtyard garden. This property has 1,807 sq. ft. of accommodation, including outbuildings, arranged over two floors. A glazed front door opens into the hallway which has access to the dua...
AN IMMACULATELY PRESENTED SEMI DETACHED BUNGALOW SITUATED IN A NO THROUGH ROAD AND ADJOINING FIELDS TO THE REAR. THE PROPERTY This semi-detached bungalow is presented to an exceptionally high standard throughout and is quietly situated in a no through road on the town outskirts. ...
A MODERN DETACHED HOUSE PRESENTED TO AN EXTREMELY HIGH STANDARD THROUGHOUT AND ENJOYING A QUIET LOCATION. THE PROPERTY This modern detached property comes on to the market with the benefit of a high specification as many additional features have been added/upgraded from the origin...
*MOVE IN NOW WITH PART EXCHANGE OR HELP TOWARDS YOUR STAMP DUTY* The Amberley is an ideal family home, with additions like underfloor heating and heated by air source heat pump. This three-bedroom house provides abundant space downstairs, complemented by three spacious bedrooms and a family bathr...
Key features
- Impressive five-bedroom end-of-terrace home
- Approximately 1,462 sq ft of accommodation
- Three bathrooms
A beautifully presented five bedroom end terrace house in the popular area of Woburn Sands. Accommodation briefly comprises of a kitchen/ diner, utility room, rear garden, lounge, downstairs WC, master bedroom with dressing room and en-suite shower, four further bedrooms and two family bathrooms.
This beautifully presented bay-fronted semi-detached home effortlessly blends timeless period character with stylish modern living. Thoughtfully extended and lovingly maintained, the property offers generous family accommodation throughout the downstairs, complemented by a stunning landscaped garden
Key features
- Character Property
- Lounge
- Dining Room
Deakin-White Estate Agents in Wing, Linslade & Leighton Buzzard are pleased to present to the market for sale a modern four-bedroom detached home arranged over three floors, offering spacious accommodation, contemporary living and a convenient location close to local amenities, schools and transp...
Key features
- Four Bedroom
- Modern Kitchen Diner
- Three Bathrooms











































