Detached Houses For Sale in LU (Postcode Area)
A wonderful, detached home offering over 10,000 sq. ft of accommodation including a fabulous leisure centre and extensive garaging, set in 11 acres of stunning grounds. Located in an elevated position on the edge of the Chilterns with marvellous walks nearby over Dunstable Downs.
Available on the open market for the first time in 35 years is this exceptional equestrian estate with full facilities. Spanning over 11,000 square feet and accessed via electric gates and a private half-mile driveway, this property features a dream equestrian setup with 13 internal stables, 29 a...
Set between the rural hamlet of Crafton and the village of Mentmore, within easy reach of Leighton Buzzard, and coming to the market for the first time in twenty-eight years, Woodlands is an exquisite custom-designed 4 bedroom home with a plethora of tempting extras, all set within four acres of ...
A five bedroom extended detached house of over 4,200 sq. ft. set in approximately 11 acres, including stables, barns, private fishing lake and paddock land. A 1930s, five bedroom detached country house set in an elevated position in grounds of over 9 acres, surrounded by established gardens and o...
A FINE AND CLASSICALLY STYLED MODERN COUNTRY HOUSE SET IN A SECLUDED HAMLET LOCATION WITH SUPERB VIEWS OVER OPEN COUNTRYSIDE. Offering the very best in modern living, this classically-styled detached house was constructed in 2008 with great attention to detail and finished to a high sp...
Glebe House is an elegant and historically significant Regency former vicarage, dating from 1835, occupying a private and elevated position within the highly regarded village of Totternhoe. Set behind St Giles Church, the property enjoys a unique sense of heritage alongside far-reaching panoramic...
A detached three bedroom house with a yard, stabling and land located in the village of Stewkley. The house has approximately 1,879 sq. ft of accommodation over two floors. On the ground floor there is a reception hall, a lobby with a cloakroom, an office, a bedroom with an en suite shower room a...
Welcome to Ludlow Avenue, a prestigious and privately gated road, where this stunning 1930s mock Tudor five-bedroom detached residence offers over 5,000 sq. ft. of beautifully designed living space. Blending timeless character with modern luxury, this exceptional family home boasts an endless swi...
A Georgian four double bedroom detached house, with a self-contained one bedroom annexe, set on a mature plot approaching 2 acres, in the Hertfordshire village of Lilley. Built in 1810, Lilley House has just under 3,850 sq. ft. of versatile accommodation including the one bedroom annexe. In addit...
A SPACIOUS, CONTEMPORAY DETACHED HOME WITHIN A PRIVATE GATED DEVELOPMENT SET IN STUNNING ANCIENT WOODLAND WITH FLEXIBLE LIVING SPACES. THE PROPERTY The Oak House is the largest of four contemporary properties located within a private gated development surrounded by ancient woodlan...
Discover this superb 5-bedroom, 5-bathroom mansion on Old Bedford Road, Luton. Boasting over 4000 sq ft of versatile accommodation, an annexe, and a beautiful garden, this property offers luxurious family living with excellent transport links. A must-see residence.
SUBSTANTIAL ACCOMMODATION EXTENDING TO OVER 5000 SQ FT INCORPORATING A POSSIBLE ANNEXE OR ENTERTAINING WING. 1.25 ACRES OF PICTURESQUE GARDENS AND WOODLAND NEIGHBOURING COUNTRYSIDE. RURAL YET NOT ISOLATED SITUATED WITHIN AN OLD FARMSTEAD.
Set back from Dagnall road at the foot of the iconic chiltern lion, this substantial and character-filled nine-bedroom detached home offers over 5,700 sq. ft of highly versatile living space. Coming to the market with no upper chain, it presents a rare opportunity to create a truly bespoke family...
A SUBSTANTIAL DETACHED GEORGIAN PROPERTY WITH A USEFUL RANGE OF OUTBUILDINGS AND SET IN GROUNDS OF ABOUT 3.33 ACRES INCLUDING FORMAL GARDENS AND A PADDOCK. Bury House is a fine five bedroom Grade II Listed country property quietly situated in the older part of the village and enjoying ...
Castles Estate Agents are pleased to represent this substantial and characterful nine bedroom DETACHED residence, offering over 5,700 sq. ft of versatile living space, complete with DOUBLE GARAGE, six bathrooms and an INDOOR SWIMMING POOL. Set back from the Dagnall Road at the base of the iconic ...
A truly outstanding detached residence, occupying a prestigious position in the highly regarded village of Studham. Beautifully extended and comprehensively renovated to an exceptional standard throughout, 'Innesfree' offers over 3600 sqft of stylish and immaculately presented accommodation...
























































