Detached Houses For Sale in Dorset
Key features
- DETACHED FAMILY HOUSE
- SITTING ROOM
- KITCHEN/DINING ROOM
A deceptively spacious and charming coastal-style chalet that offers a wonderful blend of character, space and modern family living with a versatile layout arranged over two floors. The ground floor centres around a particularly impressive open-plan kitchen/lounge/diner, creating a sociable hea...
Key features
- Coastal-style chalet with approximately 1,852 sq ft of accommodation
- Spacious open-plan kitchen/lounge/diner
- Four well-proportioned bedrooms
A spacious and well-presented four-bedroom home situated in the highly sought-after development of Poundbury, within an area of outstanding natural beauty. The property offers versatile family accommodation, including a bright dual-aspect kitchen/diner, separate utility room and generous lounge w...
Key features
- Close to Bournemouth centre and clifftops
- Spacious period home
- Three reception rooms
*Offers in Excess of £850,000-£875,000* An impressive four bedroom detached chalet-style home, ideally situated in the sought-after area of Ashley Heath. This beautifully presented property features underfloor heating throughout, a stylish contemporary kitchen fitted with high-qual...
Key features
- Detached four bedroom home
- Large reception room, blending seamlessly with the kitchen
- Useful utility room
Key features
- Beautifully remodelled detached home
- Over 2,000 sq ft of flexible accommodation
- Contemporary kitchen with central breakfast island
This superior detached house of cottage style design is situated in an excellent position in West Street approximately 200 metres from the Village Square, which is dominated by the old Castle Ruins. The property is immaculately presented throughout and has superb views of the Castle and village c...
Key features
- SUPERIOR DETACHED HOUSE OF MODERN COTTAGE STYLE DESIGN IN WEST STREET
- EXCELLENT VIEWS OF THE CASTLE AND VILLAGE CHURCH
- 200 METRES FROM THE VILLAGE SQUARE
Key features
- One of Ashley Heath's most sought after roads
- Approx. 2,428 sq ft including the double garage
- Established plot of approximately 0.45 acres
VENDOR SUITED - FABULOUS, FLEXIBLE & SPACIOUS HOME, Incredibly SOUGHT-AFTER POSITION (within 600 metres of Ringwood Forest), Wonderful PRIVATE PLOT Of 0.3 ACRES, 4 Bedrooms & 3 BATH/SHOWER ROOMS (2 en-suite), Stylish SPLIT-LEVEL, Part-Open Plan Design, Wonderful MATURE GARDENS, Double Garage
Key features
- MAGNIFICENT, SPACIOUS & FLEXIBLE, SPLIT-LEVEL HOME
- STYLISHLY IMPROVED & THOUGHTFULLY EXTENDED BY THE CURRENT OWNERS
- 4 GENEROUS BEDROOMS SET OVER 2 FLOORS
Set within an exclusive courtyard development of just four bespoke homes by the highly regarded local developer Charleston Homes, this exceptional brand new residence showcases a thoughtful blend of architectural design, quality craftsmanship and modern living.
Key features
- Breathtaking Countryside Views
- Two En-suites
- Triple Car Port
Athelleaze is a spacious detached home, perfectly suited for a large or multi-generational family. Nestled in the sought-after hamlet of Athelhampton, it boasts a generous south-facing garden, adjoining paddock, outdoor swimming pool, double garage, and ample parking - all set within 1.68 acres.
Key features
- Substantial accommodation
- Paddock with field shelter and direct access to a bridleway
- Just over 1.6-acre plot
Occupying an enviable position on one of Wimborne’s most prestigious and sought after roads, this exceptional detached family residences offers an impressive combination of space, versatility and privacy. The property has five bedrooms, four reception rooms and two bathrooms.
Key features
- Spacious sitting room with feature fireplace
- One of the area's most desirable locations
- Exceptional family residence
Key features
- Substantial Luxury 4 bedroom Residence
- Enclosed Private Grounds
- Dramatic Entrance: Grand full-height atrium entrance hall
Key features
- FOUR DOUBLE BEDROOMS
- CENTRAL CHRISTCHURCH
- GARDEN CHALET
Key features
- Beautifully presented five bedroom detached family home
- Highly sought-after coastal location, moments from Southbourne clifftop
- Spacious and beautifully presented living accommodation
Key features
- Approximately 2,270 sq ft of beautifully presented accommodation
- Superb open plan living space with dual sided gas fireplace
- Luxury kitchen with quartz worktops and premium integrated appliances
Woolley & Wallis are delighted to offer this fantastic four double bedroom detached house in the private, gated Heather Ridge Close. This property was built by Balson Homes to a very high standard & specification with just over 2000 Sq Ft approx. of flexible accommodation and the remainde...
Pettengells are delighted to offer this attractive and characterful family home, ideally situated close to a range of local amenities, well regarded schools and stunning nearby beaches. Occupying a substantial plot, the property benefits from a generous carriage driveway to the front, ...
Key features
- Substantial four bedroom family home
- Fantastic location nearby to local beaches and amenities
- Large carriage driveway and double garage
















































