Houses For Sale in Bedfordshire
Situated within a quiet cul-de-sac in the ever-popular village of Clapham, this immaculately presented three-bedroom detached family home offers an excellent combination of spacious accommodation, quality finishes and a generous plot. Built in 2002 and finished to a high specification, the proper...
A wonderful, detached home offering over 10,000 sq. ft of accommodation including a fabulous leisure centre and extensive garaging, set in 11 acres of stunning grounds. Located in an elevated position on the edge of the Chilterns with marvellous walks nearby over Dunstable Downs.
Key features
- Superb detached Edwardian residence set in 11 acres of private grounds
- Stunning elevated position
- Over 10,000 sq ft of accommodation and garaging
A SUPERB PERIOD HOUSE SET IN 2.3 ACRES OF PRIVATE, MANICURED GROUNDS WITH A LARGE ANNEX AND SEPARATE STAFF ACCOMMODATION, FIVE VEHICLE GARAGING, LOCATED IN HIGHLY SOUGHT-AFTER VILLAGE OF MILTON BRYAN WHICH BORDERS THE DUKE OF BEDFORD’S WOBURN ESTATE. Coming to the market for the ...
Some houses simply announce themselves. Approached through secure electric gates and along a newly tarmacked drive, The Grange is a substantial red brick country residence of genuine presence, measuring 12,479 sq ft across four floors and rising to 14,830 sq ft with its garage and outbuildings, s...
Key features
- Edwardian country house of 12,479 sq ft across four floors, built in 1906, and 14,830 sq ft in total including garage and outbuildings
- Approximately three acres of private, mature grounds behind secure electric gates
- Five reception rooms, plus a double height reception hall of nearly 24 ft and two home offices
A Grade II listed late 17th/early 18th century detached property situated in an elevated position on high ground with outbuildings, formal gardens and grounds in approximately 14.26 acres. The house has pebbledash rendered elevations that encase timber framing to the early parts, and brick to lat...
Key features
- Grade II listed detached property of approximately 8,237 sq. ft.
- Seven bedrooms; two en suite
- Seven reception rooms
Deluxe, 7-bedroom family home of over 5,000 square feet, two substantial, detached office buildings of over 4,250 square feet, several workshops and stores, extensive parking and 6 Acres – 1.5 miles from railway station – multiple possibilities, including equestrian and extended fa...
Key features
- Mixed use family property with 15,000 square feet overall (on 6 acres), including Main House, Two Detached Offices, Multiple Stores, Garaging and Garden Buildings
- Main house with 7 bedrooms, impressive open living space, entertainment room and air conditioning - of over 5,000 sq.ft., plus triple garage
- Two detached, modern office buildings, with potential for other uses if required (including perhaps as annexes), of 1,768 sq.ft. and 2,499 sq.ft. (4,267 sq.ft. combined)
A SUPERB BARN CONVERSION WITH 8,735 SQ FT OF ACCOMMODATION – PERFECT FOR MODERN FAMILY & MULTI-GENERATIONAL LIVING, ENTERTAINING & LEISURE WITH POOL, TENNIS COURT, WORKSHOP, STABLING & 4.4 ACRES. Whatever your property needs, Segenhoe Byre answers them in abundance. ...
A Grade II listed seven/eight bedroom period property with a detached Coach House and approximately 3.4 acres of wraparound gardens with gated driveway parking, within walking distance of village amenities. The property has a total of 8,372 sq. ft. of versatile accommodation, with over 6,730 sq. ...
Key features
- Grade II listed former Rectory
- Seven bedrooms; four bathrooms and a cloakroom
- Four reception rooms
A UNIQUE OPPORTUNITY TO ACQUIRE A FULLY RESTORED HISTORIC WATERMILL WITH SEPARATE SELF-CONTAINED ANNEXE WITH FINE VIEWS OVER FLITWICK MOOR. THE PROPERTY Flitwick Mill dates back to the 18th Century and archive records show that the present watermill started operating in 1730...
Key features
- HISTORIC MILL
- STUNNING RENOVATION
- ORIGINAL WORKINGS RETAINED
A rare opportunity to acquire a substantial country property, offering exceptional flexibility to suit a range of purchasers. The property comprises a well-appointed residence with extensive landscaped gardens and the opportunity to purchase additional land to suit your requir
Key features
- Detached thatched country residence
- Surrounded by established formal gardens
- Five bedrooms and four bath/shower rooms
Discover this stunning, chain-free 9-bedroom, 9-bathroom detached residence, exceeding 6000 sq ft, opposite Stockwood Golf Course. With four reception rooms, a self-contained annexe, and a huge gated driveway, this unique property offers multi-generational living and excellent transport links.
Key features
- Chain Free
- Stunning Detached Residence In Excess OF 6000sqft
- Opposite Stockwood Golf Court On The Prestigious London Road
A late Victorian five/six bedroom detached Villa style property in a prominent position in the centre of Bedford’s Castle Quarter and within walking distance of the riverside embankment, independent schools and railway station. The property has been restored and refurbished over the last fi...
Key features
- Late Victorian detached property
- Six bedrooms; three bath or shower rooms
- Three separate reception rooms
A four bedroom detached property with a one bedroom annexe, driveway parking, a triple garage with a one bedroom guest wing above and wrap around gardens, for sale with no upper chain. The property has 6,161 sq. ft. of versatile accommodation suitable for multi generational living. A particular h...
Key features
- Detached modern country house
- Four double bedrooms; five en-suite
- Self contained one bedroom annexe
Windmill House is a handsome and substantial Edwardian detached residence offering approximately 3,509 sq. ft. of characterful accommodation, complemented by approximately 1,304 sq. ft. of outbuildings. The property stands within mature, landscaped grounds of approximately 2 acres and includes ex...
Key features
- Substantial Edwardian detached residence dating from approximately 1910
- Designed by the highly regarded local architect E. H. C. Inskip
- Approximately 3,509 sq. ft. of principal accommodation
A portion of a Grade II* listed Georgian country mansion with extensive parking, a detached double garage, and just over an acre of private garden with far reaching views over the adjoining countryside, Ampthill parkland, and the Greensand Ridge beyond. The Manor of Ampthill has history back to H...
SET ON A PRIVATE AND GATED PLOT THIS IMPRESSIVE DETACHED FAMILY HOME WITH ANNEX AND HOME OFFICE FACILTIES, TRIPLE GARAGE AND WRAP AROUND GARDENS. THE PROPERTY Highfield House offers an exceptional blend of space and modern and versatile living, boasting in excess of 6,000 sq...
Key features
- Impressive 6-bedroom Georgian Rectory with separate Coachman's cottage
- Terrace overlooking gorgeous gardens and fields beyond
- Coachman's cottage with 1 or 2 bedrooms - Guest or income-earning accommodation
Occupying an enviable and highly private position in the sought-after village of Westoning, this exceptional six-bedroom, seven-bathroom residence offers almost 7,000 sq ft of luxurious and beautifully presented accommodation, set within extensive wrap-around gardens. From the moment of ...
Key features
- Nearly 7000SQFT of accommodation
- Sought after location
- Six larger than average bedrooms with each bedroom having an en-suite





































